YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Modeling the Effect of Subjective Factors on Productivity of Trenchless Technology Application to Buried Infrastructure Systems

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 010
    Author:
    Sameh Ali
    ,
    Tarek Zayed
    ,
    Mohamed Hegab
    DOI: 10.1061/(ASCE)0733-9364(2007)133:10(743)
    Publisher: American Society of Civil Engineers
    Abstract: Trenchless technology (TT) includes a large family of methods utilized for installing and rehabilitating underground utility systems with minimal surface disruption and destruction resulting from conventional excavation. Productivity of TT techniques is affected by a number of subjective factors that need to be evaluated. A productivity index (PI) model is developed in order to represent this subjective effect in refining productivity assessment. The analytic hierarchy process and fuzzy logic are used to develop the proposed PI model that relies on the actual performance of 12 subfactors under three main categories: management, environmental, and physical conditions. The developed PI model resulted in PI equal to 0.7323 and 0.7251 for microtunneling and horizontal directional drilling (HDD) projects, respectively. Multiattribute decision support system software is developed to determine the PI for a specific TT technique using Visual Basic. The PI model is tested, which shows reasonable results. This research is relevant to both industry practitioners and researchers. It provides practitioners with a model that justifies their productivity calculation by quantifying subjective factors effect, which will affect their schedule and cost estimation for trenchless projects. In addition, it provides researchers with the development methodology for the PI model.
    • Download: (322.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Modeling the Effect of Subjective Factors on Productivity of Trenchless Technology Application to Buried Infrastructure Systems

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/26520
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSameh Ali
    contributor authorTarek Zayed
    contributor authorMohamed Hegab
    date accessioned2017-05-08T20:46:09Z
    date available2017-05-08T20:46:09Z
    date copyrightOctober 2007
    date issued2007
    identifier other%28asce%290733-9364%282007%29133%3A10%28743%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26520
    description abstractTrenchless technology (TT) includes a large family of methods utilized for installing and rehabilitating underground utility systems with minimal surface disruption and destruction resulting from conventional excavation. Productivity of TT techniques is affected by a number of subjective factors that need to be evaluated. A productivity index (PI) model is developed in order to represent this subjective effect in refining productivity assessment. The analytic hierarchy process and fuzzy logic are used to develop the proposed PI model that relies on the actual performance of 12 subfactors under three main categories: management, environmental, and physical conditions. The developed PI model resulted in PI equal to 0.7323 and 0.7251 for microtunneling and horizontal directional drilling (HDD) projects, respectively. Multiattribute decision support system software is developed to determine the PI for a specific TT technique using Visual Basic. The PI model is tested, which shows reasonable results. This research is relevant to both industry practitioners and researchers. It provides practitioners with a model that justifies their productivity calculation by quantifying subjective factors effect, which will affect their schedule and cost estimation for trenchless projects. In addition, it provides researchers with the development methodology for the PI model.
    publisherAmerican Society of Civil Engineers
    titleModeling the Effect of Subjective Factors on Productivity of Trenchless Technology Application to Buried Infrastructure Systems
    typeJournal Paper
    journal volume133
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2007)133:10(743)
    treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian