YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 001
    Author:
    Youngsoo Jung
    ,
    Seunghee Kang
    DOI: 10.1061/(ASCE)0733-9364(2007)133:1(10)
    Publisher: American Society of Civil Engineers
    Abstract: Though the progress of construction projects is most often used as a critical index for effective project management, the method, structure, data, and accuracy of detailed progress measurement may vary depending on specific characteristics of a project. This situation can lead to misinterpretation of the project status, especially under a multiproject management environment. It is also a daunting task for the inexperienced engineers to formulate and monitor the project-specific work packages. At the same time, maintaining very detailed and highly accurate progress information requires excessive managerial efforts. In order to address this issue, this study proposes the concept of standard progress measurement package. Issues for standardization of the work breakdown structure that can embody distinct characteristics of different construction projects are investigated. The proposed methodology facilitates automated formulating of work packages by using a historical database and also automates the gathering of progress information through the use of standardized methods and tools. A case-study project is evaluated in order to examine the practicability of the proposed system.
    • Download: (802.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/26364
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorYoungsoo Jung
    contributor authorSeunghee Kang
    date accessioned2017-05-08T20:45:54Z
    date available2017-05-08T20:45:54Z
    date copyrightJanuary 2007
    date issued2007
    identifier other%28asce%290733-9364%282007%29133%3A1%2810%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26364
    description abstractThough the progress of construction projects is most often used as a critical index for effective project management, the method, structure, data, and accuracy of detailed progress measurement may vary depending on specific characteristics of a project. This situation can lead to misinterpretation of the project status, especially under a multiproject management environment. It is also a daunting task for the inexperienced engineers to formulate and monitor the project-specific work packages. At the same time, maintaining very detailed and highly accurate progress information requires excessive managerial efforts. In order to address this issue, this study proposes the concept of standard progress measurement package. Issues for standardization of the work breakdown structure that can embody distinct characteristics of different construction projects are investigated. The proposed methodology facilitates automated formulating of work packages by using a historical database and also automates the gathering of progress information through the use of standardized methods and tools. A case-study project is evaluated in order to examine the practicability of the proposed system.
    publisherAmerican Society of Civil Engineers
    titleKnowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control
    typeJournal Paper
    journal volume133
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2007)133:1(10)
    treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian