YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Survey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 007
    Author:
    Patricia D. Galloway
    DOI: 10.1061/(ASCE)0733-9364(2006)132:7(697)
    Publisher: American Society of Civil Engineers
    Abstract: While critical-path method (CPM) scheduling has been around since the 1950s, its application in the construction industry has still not received 100% acceptance or consistency in how it is used. Project controls, and CPM scheduling in particular, have gone unchanged in the standards arena with little focus for a common understanding and recognition of what is required for CPM schedule development, implementation, and use. In recent years, little research has been conducted relative to the use of CPM and its benefits. In order to determine how the industry views its applicability and usage, a survey was developed for the stakeholders in the construction industry. This paper summarizes extensive research that was performed of the construction industry relative to the use of CPM scheduling, its applicability and its acceptance in the execution of today’s constructed projects. The research obtained the stakeholders’ views on the use and effectiveness of CPM scheduling; the necessary qualifications of scheduling personnel; and opinions relative to whether standards and/or best practices are necessary. The paper discusses the different views of the stakeholders and recommendations as to how consistency can be obtained in the use of CPM scheduling in order to improve the construction industry.
    • Download: (920.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Survey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/25954
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorPatricia D. Galloway
    date accessioned2017-05-08T20:45:12Z
    date available2017-05-08T20:45:12Z
    date copyrightJuly 2006
    date issued2006
    identifier other%28asce%290733-9364%282006%29132%3A7%28697%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/25954
    description abstractWhile critical-path method (CPM) scheduling has been around since the 1950s, its application in the construction industry has still not received 100% acceptance or consistency in how it is used. Project controls, and CPM scheduling in particular, have gone unchanged in the standards arena with little focus for a common understanding and recognition of what is required for CPM schedule development, implementation, and use. In recent years, little research has been conducted relative to the use of CPM and its benefits. In order to determine how the industry views its applicability and usage, a survey was developed for the stakeholders in the construction industry. This paper summarizes extensive research that was performed of the construction industry relative to the use of CPM scheduling, its applicability and its acceptance in the execution of today’s constructed projects. The research obtained the stakeholders’ views on the use and effectiveness of CPM scheduling; the necessary qualifications of scheduling personnel; and opinions relative to whether standards and/or best practices are necessary. The paper discusses the different views of the stakeholders and recommendations as to how consistency can be obtained in the use of CPM scheduling in order to improve the construction industry.
    publisherAmerican Society of Civil Engineers
    titleSurvey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects
    typeJournal Paper
    journal volume132
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2006)132:7(697)
    treeJournal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian