YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Scheduling-Based Risk Estimation and Safety Planning for Construction Projects

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 006
    Author:
    Kyoo-Jin Yi
    ,
    David Langford
    DOI: 10.1061/(ASCE)0733-9364(2006)132:6(626)
    Publisher: American Society of Civil Engineers
    Abstract: This paper considers the issue of safety risks on construction sites. It introduces the concept of combined effect of different risk factors to the accident. For proper safety planning, safety managers need to be well aware of the direct causes of the accident as well as indirect factors that adversely effect on site safety. If it is observed that if a hazardous environment exists at the site, then either that hazardous environment must be eliminated or occupations and processes related to that hazard must be properly protected. One of the measures for evading such hazardous situations is to predict such situations and to reschedule the start time of high-risk situation so that risks are not concentrated during certain periods and at certain locations. In order to predict when and where the risk will reach its highest level, analysis should be performed based upon various information including statistical sources such as accident histories and this should be done in coordination with the activity scheduling. This paper analyzes the result of accident history and provides information about vulnerable situations. In addition, it presents a theory of safety planning method which estimates the risk distribution of a project and helps the safety manager to both estimate situations of concentrated risk and then to reschedule it when it is necessary.
    • Download: (929.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Scheduling-Based Risk Estimation and Safety Planning for Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/25854
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorKyoo-Jin Yi
    contributor authorDavid Langford
    date accessioned2017-05-08T20:45:02Z
    date available2017-05-08T20:45:02Z
    date copyrightJune 2006
    date issued2006
    identifier other%28asce%290733-9364%282006%29132%3A6%28626%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/25854
    description abstractThis paper considers the issue of safety risks on construction sites. It introduces the concept of combined effect of different risk factors to the accident. For proper safety planning, safety managers need to be well aware of the direct causes of the accident as well as indirect factors that adversely effect on site safety. If it is observed that if a hazardous environment exists at the site, then either that hazardous environment must be eliminated or occupations and processes related to that hazard must be properly protected. One of the measures for evading such hazardous situations is to predict such situations and to reschedule the start time of high-risk situation so that risks are not concentrated during certain periods and at certain locations. In order to predict when and where the risk will reach its highest level, analysis should be performed based upon various information including statistical sources such as accident histories and this should be done in coordination with the activity scheduling. This paper analyzes the result of accident history and provides information about vulnerable situations. In addition, it presents a theory of safety planning method which estimates the risk distribution of a project and helps the safety manager to both estimate situations of concentrated risk and then to reschedule it when it is necessary.
    publisherAmerican Society of Civil Engineers
    titleScheduling-Based Risk Estimation and Safety Planning for Construction Projects
    typeJournal Paper
    journal volume132
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2006)132:6(626)
    treeJournal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian