description abstract | The Brent Reservoir was constructed in the mid-1830s and its siphon spillways were completed in 1936 to protect the dam from overtopping in the event of an extreme flood. Since completion, there have been problems with the hydraulic performance of the siphons, some of which primed simultaneously, causing flooding downstream. A physical hydraulic model study has been conducted to investigate the hydraulic performance of the siphons in order to establish reliable stage discharge relationships. The existing bellmouth siphon system was found to be unsuitable, causing the siphons to prime suddenly at discharges of around 3 m | |
publisher | American Society of Civil Engineers | |
title | Case Study on Hydraulic Performance of Brent Reservoir Siphon Spillway | |
type | Journal Paper | |
journal volume | 128 | |
journal issue | 6 | |
journal title | Journal of Hydraulic Engineering | |
identifier doi | 10.1061/(ASCE)0733-9429(2002)128:6(562) | |
tree | Journal of Hydraulic Engineering:;2002:;Volume ( 128 ):;issue: 006 | |
contenttype | Fulltext | |