YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Contractor Process Improvement for Enhancing Construction Productivity

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 002
    Author:
    David S. Cottrell
    DOI: 10.1061/(ASCE)0733-9364(2006)132:2(189)
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents a regression model that relates job site productivity to process improvement initiatives (PIIs) executed both before and during construction. Applied during early project stages, this model helps industry practitioners to predict the expected value of labor productivity based on certain inputs related to preconstruction planning and construction execution. The model demonstrates the strong relationship of project performance to a variety of PIIs including design completeness, definition of a project vision statement, testing oversight, and project manager experience and dedication. The correlational research methodology targeted 75 projects representing approximately $274.53 million in civil construction. The data collection effort considered 45 PIIs (independent variables) using quantitative and qualitative measures. The modeling technique involved the use of multiple linear regression, a method that exploits available data from multiple, independent sources to focus on specific outcomes. The model was developed directly from contractor specific information and subjected to rigorous statistical analysis. The model provides project managers as front line industry practitioners with a deliberate yet practical approach to project management and productivity enhancement. The modeling results include verification analysis and a discussion of the model’s usefulness and limitations.
    • Download: (157.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Contractor Process Improvement for Enhancing Construction Productivity

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/25275
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDavid S. Cottrell
    date accessioned2017-05-08T20:44:08Z
    date available2017-05-08T20:44:08Z
    date copyrightFebruary 2006
    date issued2006
    identifier other%28asce%290733-9364%282006%29132%3A2%28189%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/25275
    description abstractThis paper presents a regression model that relates job site productivity to process improvement initiatives (PIIs) executed both before and during construction. Applied during early project stages, this model helps industry practitioners to predict the expected value of labor productivity based on certain inputs related to preconstruction planning and construction execution. The model demonstrates the strong relationship of project performance to a variety of PIIs including design completeness, definition of a project vision statement, testing oversight, and project manager experience and dedication. The correlational research methodology targeted 75 projects representing approximately $274.53 million in civil construction. The data collection effort considered 45 PIIs (independent variables) using quantitative and qualitative measures. The modeling technique involved the use of multiple linear regression, a method that exploits available data from multiple, independent sources to focus on specific outcomes. The model was developed directly from contractor specific information and subjected to rigorous statistical analysis. The model provides project managers as front line industry practitioners with a deliberate yet practical approach to project management and productivity enhancement. The modeling results include verification analysis and a discussion of the model’s usefulness and limitations.
    publisherAmerican Society of Civil Engineers
    titleContractor Process Improvement for Enhancing Construction Productivity
    typeJournal Paper
    journal volume132
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2006)132:2(189)
    treeJournal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian