YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Linear Programming Approach to Optimize Strategic Investment in the Construction Workforce

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 011
    Author:
    Issam M. Srour
    ,
    Carl T. Haas
    ,
    David P. Morton
    DOI: 10.1061/(ASCE)0733-9364(2006)132:11(1158)
    Publisher: American Society of Civil Engineers
    Abstract: The construction industry in the United States and other parts of the world has been facing several challenges, including a shortage of skilled workers. A review of the relevant body of knowledge indicates that one of the key reasons for this problem is the absence of human resource management strategies for construction workers at project, corporate, regional, or industry levels. This paper addresses the issues of workforce training and allocation on construction projects. It presents a framework to optimize the investment in, and to make the best use of, the available workforce with the intent to reduce project costs and improve schedule performance. A linear program model, entitled the Optimal Workforce Investment Model, is built to provide an optimization-based framework for matching supply and demand of construction labor most efficiently through training, recruitment, and allocation. Given a project schedule or demand profile and the available pool of workers, the suggested model provides human resource managers a combined strategy for training the available workers and hiring additional workers. The input data to the proposed model consists of a certain available labor pool, cost figures for training workers in different skills, the cost of hiring workers, hourly labor wages, and estimates of affinities between the different considered skills. The objective of the model is to minimize labor costs while satisfying project labor demands. Results from application of the model to typical situations are presented, and recommendations for future developments are made.
    • Download: (175.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Linear Programming Approach to Optimize Strategic Investment in the Construction Workforce

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/24954
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorIssam M. Srour
    contributor authorCarl T. Haas
    contributor authorDavid P. Morton
    date accessioned2017-05-08T20:43:40Z
    date available2017-05-08T20:43:40Z
    date copyrightNovember 2006
    date issued2006
    identifier other%28asce%290733-9364%282006%29132%3A11%281158%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/24954
    description abstractThe construction industry in the United States and other parts of the world has been facing several challenges, including a shortage of skilled workers. A review of the relevant body of knowledge indicates that one of the key reasons for this problem is the absence of human resource management strategies for construction workers at project, corporate, regional, or industry levels. This paper addresses the issues of workforce training and allocation on construction projects. It presents a framework to optimize the investment in, and to make the best use of, the available workforce with the intent to reduce project costs and improve schedule performance. A linear program model, entitled the Optimal Workforce Investment Model, is built to provide an optimization-based framework for matching supply and demand of construction labor most efficiently through training, recruitment, and allocation. Given a project schedule or demand profile and the available pool of workers, the suggested model provides human resource managers a combined strategy for training the available workers and hiring additional workers. The input data to the proposed model consists of a certain available labor pool, cost figures for training workers in different skills, the cost of hiring workers, hourly labor wages, and estimates of affinities between the different considered skills. The objective of the model is to minimize labor costs while satisfying project labor demands. Results from application of the model to typical situations are presented, and recommendations for future developments are made.
    publisherAmerican Society of Civil Engineers
    titleLinear Programming Approach to Optimize Strategic Investment in the Construction Workforce
    typeJournal Paper
    journal volume132
    journal issue11
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2006)132:11(1158)
    treeJournal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian