| contributor author | Theodore G. Cleveland | |
| contributor author | Adebola Fashokun | |
| date accessioned | 2017-05-08T20:43:34Z | |
| date available | 2017-05-08T20:43:34Z | |
| date copyright | October 2006 | |
| date issued | 2006 | |
| identifier other | %28asce%290733-9364%282006%29132%3A10%281122%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/24887 | |
| description abstract | A highway construction site was monitored to determine the effectiveness of a temporary sediment control (rock-filter dam) that was part of the pollution prevention plan that protected storm water from leaving the site. Selected water quality parameters were monitored along with solids-specific parameters. The results were compared in a before-during-after approach and an upstream-downstream approach using a two-sample | |
| publisher | American Society of Civil Engineers | |
| title | Construction-Associated Solids Loads with a Temporary Sediment Control BMP | |
| type | Journal Paper | |
| journal volume | 132 | |
| journal issue | 10 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)0733-9364(2006)132:10(1122) | |
| tree | Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 010 | |
| contenttype | Fulltext | |