YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Hydraulic Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Hydraulic Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Riprap Sizing at Toe of Embankment Slopes

    Source: Journal of Hydraulic Engineering:;1998:;Volume ( 124 ):;issue: 007
    Author:
    Steven R. Abt
    ,
    T. L. Johnson
    ,
    Christopher I. Thornton
    ,
    Stuart C. Trabant
    DOI: 10.1061/(ASCE)0733-9429(1998)124:7(672)
    Publisher: American Society of Civil Engineers
    Abstract: A pilot study was conducted to evaluate existing rock-sizing techniques for stabilizing transition toes of embankments. The U.S. Bureau of Reclamation and the U.S. Army Corps of Engineers (Campbell) procedures were applied and determined to be conservative in sizing riprap. Embankment-overtopping tests were conducted placing 8.9, 13.0, and 19.8-cm-diameter stones at the slope transition. An alternative method was developed for sizing toe rock based upon the unit discharge, embankment slope, and flow concentration. The results indicate that an embankment toe can be stabilized with a smaller median stone size than previously anticipated. These results were verified for unit discharges of 0.54 m
    • Download: (621.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Riprap Sizing at Toe of Embankment Slopes

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/24663
    Collections
    • Journal of Hydraulic Engineering

    Show full item record

    contributor authorSteven R. Abt
    contributor authorT. L. Johnson
    contributor authorChristopher I. Thornton
    contributor authorStuart C. Trabant
    date accessioned2017-05-08T20:43:11Z
    date available2017-05-08T20:43:11Z
    date copyrightJuly 1998
    date issued1998
    identifier other%28asce%290733-9429%281998%29124%3A7%28672%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/24663
    description abstractA pilot study was conducted to evaluate existing rock-sizing techniques for stabilizing transition toes of embankments. The U.S. Bureau of Reclamation and the U.S. Army Corps of Engineers (Campbell) procedures were applied and determined to be conservative in sizing riprap. Embankment-overtopping tests were conducted placing 8.9, 13.0, and 19.8-cm-diameter stones at the slope transition. An alternative method was developed for sizing toe rock based upon the unit discharge, embankment slope, and flow concentration. The results indicate that an embankment toe can be stabilized with a smaller median stone size than previously anticipated. These results were verified for unit discharges of 0.54 m
    publisherAmerican Society of Civil Engineers
    titleRiprap Sizing at Toe of Embankment Slopes
    typeJournal Paper
    journal volume124
    journal issue7
    journal titleJournal of Hydraulic Engineering
    identifier doi10.1061/(ASCE)0733-9429(1998)124:7(672)
    treeJournal of Hydraulic Engineering:;1998:;Volume ( 124 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian