YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 009
    Author:
    I-Tung Yang
    DOI: 10.1061/(ASCE)0733-9364(2005)131:9(1002)
    Publisher: American Society of Civil Engineers
    Abstract: This paper proposes a chance-constrained programming model to incorporate the variability of funding, which is quantified by the coefficient of variation. The proposed model formulates financial feasibility as a stochastic constraint, transforms it into a deterministic equivalent at a prespecified confidence level, and solves the system by means of classical optimization techniques. The time–cost curve generated by the proposed model serves as a foundation for optimizing total project cost. To demonstrate the uniqueness of the proposed model, it is compared to previous approaches through a small building example.
    • Download: (151.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/24497
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorI-Tung Yang
    date accessioned2017-05-08T20:42:55Z
    date available2017-05-08T20:42:55Z
    date copyrightSeptember 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A9%281002%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/24497
    description abstractThis paper proposes a chance-constrained programming model to incorporate the variability of funding, which is quantified by the coefficient of variation. The proposed model formulates financial feasibility as a stochastic constraint, transforms it into a deterministic equivalent at a prespecified confidence level, and solves the system by means of classical optimization techniques. The time–cost curve generated by the proposed model serves as a foundation for optimizing total project cost. To demonstrate the uniqueness of the proposed model, it is compared to previous approaches through a small building example.
    publisherAmerican Society of Civil Engineers
    titleChance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability
    typeJournal Paper
    journal volume131
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:9(1002)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian