YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Key Constraints Analysis with Integrated Production Scheduler

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 007
    Author:
    D. K. Chua
    ,
    L. J. Shen
    DOI: 10.1061/(ASCE)0733-9364(2005)131:7(753)
    Publisher: American Society of Civil Engineers
    Abstract: Project delays due to late availabilities of resource and information (RI) prerequisites are one of the major threats to construction management. It is desirable to avoid such delays through better means of constraint management. With most contemporary planning methodologies and tools, it is generally difficult to represent many hidden flow constraints in a construction work plan. However, evaluating the impact of flow constraints is crucial in determining their criticalities, based on which the flow constraints may be prioritized and consequently resolved to minimize project delays. Due to the fact that limited resources are often shared among various trades, it may not be practical to resolve all the constraints simultaneously so that a tradeoff is inevitable, which suggests that management should focus on the most important ones termed as key constraints (i.e., those directly contributing to project delays). This paper presents a methodology that augments the traditional critical path method with RI availability constraints to analyze the causes of delays and locate the key constraints binding on project completion without ambiguity based on the principles of the theory of constraints. The methodology of key constraint analysis has been implemented with the integrated production scheduler, a constraint-based scheduling tool which facilitates the modeling, analysis, and management of constraints at the production planning level. An illustrative example is depicted to demonstrate how the proposed methodology works.
    • Download: (2.185Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Key Constraints Analysis with Integrated Production Scheduler

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/24231
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorD. K. Chua
    contributor authorL. J. Shen
    date accessioned2017-05-08T20:42:28Z
    date available2017-05-08T20:42:28Z
    date copyrightJuly 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A7%28753%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/24231
    description abstractProject delays due to late availabilities of resource and information (RI) prerequisites are one of the major threats to construction management. It is desirable to avoid such delays through better means of constraint management. With most contemporary planning methodologies and tools, it is generally difficult to represent many hidden flow constraints in a construction work plan. However, evaluating the impact of flow constraints is crucial in determining their criticalities, based on which the flow constraints may be prioritized and consequently resolved to minimize project delays. Due to the fact that limited resources are often shared among various trades, it may not be practical to resolve all the constraints simultaneously so that a tradeoff is inevitable, which suggests that management should focus on the most important ones termed as key constraints (i.e., those directly contributing to project delays). This paper presents a methodology that augments the traditional critical path method with RI availability constraints to analyze the causes of delays and locate the key constraints binding on project completion without ambiguity based on the principles of the theory of constraints. The methodology of key constraint analysis has been implemented with the integrated production scheduler, a constraint-based scheduling tool which facilitates the modeling, analysis, and management of constraints at the production planning level. An illustrative example is depicted to demonstrate how the proposed methodology works.
    publisherAmerican Society of Civil Engineers
    titleKey Constraints Analysis with Integrated Production Scheduler
    typeJournal Paper
    journal volume131
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:7(753)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian