YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Interface Management for China’s Build–Operate–Transfer Projects

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 006
    Author:
    Weng Tat Chan
    ,
    Chuan Chen
    ,
    John I. Messner
    ,
    David Kim Chua
    DOI: 10.1061/(ASCE)0733-9364(2005)131:6(645)
    Publisher: American Society of Civil Engineers
    Abstract: Stringent pressure on public finances has made China’s infrastructure development a “bottleneck” in its bid to sustain rapid economic growth. As a result, many modalities have been developed to utilize the resources and skills of the private sector to supply essential infrastructure products and services, as well as to improve the efficiency in government procurement of the same. The build–operate–transfer (BOT) approach is an important example of these innovative modalities. The BOT approach in China is still in its infancy; many pitfalls await the unwary and obstacles impede more extensive application of this modality. The pitfalls are attributable to the complexities in the BOT approach, particularly when attempted in China’s transition economy emerging from decades of central planning to become one that is more market driven and globally integrated. This paper proposes two systems concepts to help manage this complexity: (1) a process modeling approach that maps key functions, parameters and interfaces in the project delivery process, and (2) the use of interface management involving specific measures that have contributed towards project success in Chinese BOT projects. The process modeling approach has led to the development of China’s BOT generic process model (CBGPM). Expert opinion was elicited on the criticality of the interfaces identified in CBGPM as well as the effectiveness of selected interface management measures. Finally, an interface management framework consisting of five key steps is suggested for China’s BOT projects.
    • Download: (125.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Interface Management for China’s Build–Operate–Transfer Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/24109
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorWeng Tat Chan
    contributor authorChuan Chen
    contributor authorJohn I. Messner
    contributor authorDavid Kim Chua
    date accessioned2017-05-08T20:42:17Z
    date available2017-05-08T20:42:17Z
    date copyrightJune 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A6%28645%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/24109
    description abstractStringent pressure on public finances has made China’s infrastructure development a “bottleneck” in its bid to sustain rapid economic growth. As a result, many modalities have been developed to utilize the resources and skills of the private sector to supply essential infrastructure products and services, as well as to improve the efficiency in government procurement of the same. The build–operate–transfer (BOT) approach is an important example of these innovative modalities. The BOT approach in China is still in its infancy; many pitfalls await the unwary and obstacles impede more extensive application of this modality. The pitfalls are attributable to the complexities in the BOT approach, particularly when attempted in China’s transition economy emerging from decades of central planning to become one that is more market driven and globally integrated. This paper proposes two systems concepts to help manage this complexity: (1) a process modeling approach that maps key functions, parameters and interfaces in the project delivery process, and (2) the use of interface management involving specific measures that have contributed towards project success in Chinese BOT projects. The process modeling approach has led to the development of China’s BOT generic process model (CBGPM). Expert opinion was elicited on the criticality of the interfaces identified in CBGPM as well as the effectiveness of selected interface management measures. Finally, an interface management framework consisting of five key steps is suggested for China’s BOT projects.
    publisherAmerican Society of Civil Engineers
    titleInterface Management for China’s Build–Operate–Transfer Projects
    typeJournal Paper
    journal volume131
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:6(645)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian