YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Analytic Network Process Applied to Project Selection

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 004
    Author:
    Eddie W. L. Cheng
    ,
    Heng Li
    DOI: 10.1061/(ASCE)0733-9364(2005)131:4(459)
    Publisher: American Society of Civil Engineers
    Abstract: Owing to the complexity of a construction project, the analytic network process (ANP) is helpful to deal with interdependent relationships within a multicriteria decision-making model. This paper demonstrates an example to illustrate how to empirically prioritize a set of projects by using a five-level project selection model. A questionnaire was filled by a group of construction professionals of a medium-sized local developer and scores were computed for prioritizing the potential projects. The paper is relevant to both industry practitioners and researchers. Industry practitioners may adopt the weighted criteria for direct project selection or apply the ANP method to prioritize their own set of selection criteria. Researchers may rely on this paper as a point of departure for exploring other uses of ANP.
    • Download: (255.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Analytic Network Process Applied to Project Selection

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/23865
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorEddie W. L. Cheng
    contributor authorHeng Li
    date accessioned2017-05-08T20:41:54Z
    date available2017-05-08T20:41:54Z
    date copyrightApril 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A4%28459%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/23865
    description abstractOwing to the complexity of a construction project, the analytic network process (ANP) is helpful to deal with interdependent relationships within a multicriteria decision-making model. This paper demonstrates an example to illustrate how to empirically prioritize a set of projects by using a five-level project selection model. A questionnaire was filled by a group of construction professionals of a medium-sized local developer and scores were computed for prioritizing the potential projects. The paper is relevant to both industry practitioners and researchers. Industry practitioners may adopt the weighted criteria for direct project selection or apply the ANP method to prioritize their own set of selection criteria. Researchers may rely on this paper as a point of departure for exploring other uses of ANP.
    publisherAmerican Society of Civil Engineers
    titleAnalytic Network Process Applied to Project Selection
    typeJournal Paper
    journal volume131
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:4(459)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian