YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Quantifying Engineering Project Scope for Productivity Modeling

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 003
    Author:
    Lingguang Song
    ,
    Simaan M. AbouRizk
    DOI: 10.1061/(ASCE)0733-9364(2005)131:3(360)
    Publisher: American Society of Civil Engineers
    Abstract: A poor scope definition in an engineering design project disrupts project rhythm, causes rework, increases project time and cost, and lowers the productivity and morale of the workforce. A quantitative measurement of the project scope is the basis for productivity modeling that involves the measurement, estimation, control, and evaluation of productivity. This paper proposes a conceptual model, the quantitative engineering project scope definition (QEPSD), to standardize the measurement of engineering project scope in construction projects, within a computer aided design environment. The QEPSD quantitatively measures engineering project scope, in terms of the complexity of design items by defining design categories and complexity functions appropriate to the particular discipline. The proposed method was originally verified and implemented specifically for steel drafting projects. Actual data was analyzed and used to demonstrate the benefits of historical data prepared using QEPSD for project scope definition. It was found that the new method led to increased utilization of previously untapped values in historical data, improving the accuracy of project scope definition, and productivity modeling. The paper concludes with a discussion of the potential benefits of adopting the QEPSD method, and its implications upon various project management functions.
    • Download: (101.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Quantifying Engineering Project Scope for Productivity Modeling

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/23720
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorLingguang Song
    contributor authorSimaan M. AbouRizk
    date accessioned2017-05-08T20:41:37Z
    date available2017-05-08T20:41:37Z
    date copyrightMarch 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A3%28360%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/23720
    description abstractA poor scope definition in an engineering design project disrupts project rhythm, causes rework, increases project time and cost, and lowers the productivity and morale of the workforce. A quantitative measurement of the project scope is the basis for productivity modeling that involves the measurement, estimation, control, and evaluation of productivity. This paper proposes a conceptual model, the quantitative engineering project scope definition (QEPSD), to standardize the measurement of engineering project scope in construction projects, within a computer aided design environment. The QEPSD quantitatively measures engineering project scope, in terms of the complexity of design items by defining design categories and complexity functions appropriate to the particular discipline. The proposed method was originally verified and implemented specifically for steel drafting projects. Actual data was analyzed and used to demonstrate the benefits of historical data prepared using QEPSD for project scope definition. It was found that the new method led to increased utilization of previously untapped values in historical data, improving the accuracy of project scope definition, and productivity modeling. The paper concludes with a discussion of the potential benefits of adopting the QEPSD method, and its implications upon various project management functions.
    publisherAmerican Society of Civil Engineers
    titleQuantifying Engineering Project Scope for Productivity Modeling
    typeJournal Paper
    journal volume131
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:3(360)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian