YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Time–Cost Relationships in Australian Building Construction Projects

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 002
    Author:
    Peter E. D. Love
    ,
    Raymond Y. C. Tse
    ,
    David J. Edwards
    DOI: 10.1061/(ASCE)0733-9364(2005)131:2(187)
    Publisher: American Society of Civil Engineers
    Abstract: Project time–cost relationships were examined by using project scope factors as predictors for 161 construction projects that were completed in various Australian States using the multiple regression technique of weighted least squares. The analysis was performed between project duration (i.e., time), project type, procurement method, tender type, gross floor area (GFA), and number of stories. An alternative model to that proposed by Bromilow more than three decades ago for forecasting time and cost performance is proposed. It is shown that GFA and the number of stories in a building are key determinants of time performance in projects. Furthermore, the results indicate that cost is a poor predictor of time performance. Limitations and practical implications of the research are also presented.
    • Download: (121.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Time–Cost Relationships in Australian Building Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/23497
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorPeter E. D. Love
    contributor authorRaymond Y. C. Tse
    contributor authorDavid J. Edwards
    date accessioned2017-05-08T20:41:11Z
    date available2017-05-08T20:41:11Z
    date copyrightFebruary 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A2%28187%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/23497
    description abstractProject time–cost relationships were examined by using project scope factors as predictors for 161 construction projects that were completed in various Australian States using the multiple regression technique of weighted least squares. The analysis was performed between project duration (i.e., time), project type, procurement method, tender type, gross floor area (GFA), and number of stories. An alternative model to that proposed by Bromilow more than three decades ago for forecasting time and cost performance is proposed. It is shown that GFA and the number of stories in a building are key determinants of time performance in projects. Furthermore, the results indicate that cost is a poor predictor of time performance. Limitations and practical implications of the research are also presented.
    publisherAmerican Society of Civil Engineers
    titleTime–Cost Relationships in Australian Building Construction Projects
    typeJournal Paper
    journal volume131
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:2(187)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian