YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Improved Measured Mile Analysis Technique

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 012
    Author:
    William Ibbs
    ,
    Min Liu
    DOI: 10.1061/(ASCE)0733-9364(2005)131:12(1249)
    Publisher: American Society of Civil Engineers
    Abstract: Quantifying lost labor productivity on construction projects is difficult and sometimes subjective. A widely accepted way to quantify losses is the “measured mile” approach. It compares periods of a project that have been impacted by change to those that have not been impacted. As currently practiced the measured mile relies on subjectively identifying that reference period. In this paper the measured mile and a variant, the baseline method, are analyzed and compared to a new, proposed statistical clustering method. This new approach is advocated because it determines its reference period using objective criteria. A case study is included to show how the three methods work, and advantages and disadvantages of each method are presented in this paper.
    • Download: (308.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Improved Measured Mile Analysis Technique

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/23320
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorWilliam Ibbs
    contributor authorMin Liu
    date accessioned2017-05-08T20:40:52Z
    date available2017-05-08T20:40:52Z
    date copyrightDecember 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A12%281249%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/23320
    description abstractQuantifying lost labor productivity on construction projects is difficult and sometimes subjective. A widely accepted way to quantify losses is the “measured mile” approach. It compares periods of a project that have been impacted by change to those that have not been impacted. As currently practiced the measured mile relies on subjectively identifying that reference period. In this paper the measured mile and a variant, the baseline method, are analyzed and compared to a new, proposed statistical clustering method. This new approach is advocated because it determines its reference period using objective criteria. A case study is included to show how the three methods work, and advantages and disadvantages of each method are presented in this paper.
    publisherAmerican Society of Civil Engineers
    titleImproved Measured Mile Analysis Technique
    typeJournal Paper
    journal volume131
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:12(1249)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian