contributor author | Michael J. Horman | |
contributor author | Russell Kenley | |
date accessioned | 2017-05-08T20:40:10Z | |
date available | 2017-05-08T20:40:10Z | |
date copyright | January 2005 | |
date issued | 2005 | |
identifier other | %28asce%290733-9364%282005%29131%3A1%2852%29.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/22954 | |
description abstract | Quantifying the waste present in an operation is an important part of a number of performance improvement initiatives in the architecture engineering construction industry. Contemporary management approaches focus on waste minimization to reduce operating costs and to increase operating responsiveness and flexibility. In construction, studies have been conducted over the past | |
publisher | American Society of Civil Engineers | |
title | Quantifying Levels of Wasted Time in Construction with Meta-Analysis | |
type | Journal Paper | |
journal volume | 131 | |
journal issue | 1 | |
journal title | Journal of Construction Engineering and Management | |
identifier doi | 10.1061/(ASCE)0733-9364(2005)131:1(52) | |
tree | Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 001 | |
contenttype | Fulltext | |