YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Production System Loading–Cycle Time Relationship in Residential Construction

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 001
    Author:
    Howard H. Bashford
    ,
    Kenneth D. Walsh
    ,
    Anil Sawhney
    DOI: 10.1061/(ASCE)0733-9364(2005)131:1(15)
    Publisher: American Society of Civil Engineers
    Abstract: Production home building possesses characteristics similar to manufacturing processes, such as the construction of more or less similar houses repeatedly and a growing demand for mass customization of homes. As a result of these similarities, larger homebuilders often attempt to view their production system as an assembly line process. However, the management tools generally utilized by these home builders are those used in other sectors of the construction industry, such as critical path method scheduling, cost estimating, and earned value analysis. These management tools do not provide an explanation or control/prediction tools for many undesirable situations that arise during home building, such as increasing cycle time which slows delivery of product to consumers and increases project capital costs, and increasing amounts of work in process that increases capital investment and thereby decreases company financial performance. In order to bring better management tools to the residential construction industry, this study examines relationships between cycle time, work in process, system throughput, new construction starts, and the capacity of the production system using building permit data for new single family homes in Chandler, Ariz. The applicability of Little’s law, a basic equation used in factory production management models, to a residential production system is examined. This study shows a definite, predictable relationship between cycle time, work in process, and production system throughput. It provides a pathway for further study of production system characteristics that have historically not been included in construction management models, with the expectation of developing new construction management tools that will account for more of the characteristics of construction production systems that affect project performance and company financial performance.
    • Download: (145.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Production System Loading–Cycle Time Relationship in Residential Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/22898
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorHoward H. Bashford
    contributor authorKenneth D. Walsh
    contributor authorAnil Sawhney
    date accessioned2017-05-08T20:40:02Z
    date available2017-05-08T20:40:02Z
    date copyrightJanuary 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A1%2815%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/22898
    description abstractProduction home building possesses characteristics similar to manufacturing processes, such as the construction of more or less similar houses repeatedly and a growing demand for mass customization of homes. As a result of these similarities, larger homebuilders often attempt to view their production system as an assembly line process. However, the management tools generally utilized by these home builders are those used in other sectors of the construction industry, such as critical path method scheduling, cost estimating, and earned value analysis. These management tools do not provide an explanation or control/prediction tools for many undesirable situations that arise during home building, such as increasing cycle time which slows delivery of product to consumers and increases project capital costs, and increasing amounts of work in process that increases capital investment and thereby decreases company financial performance. In order to bring better management tools to the residential construction industry, this study examines relationships between cycle time, work in process, system throughput, new construction starts, and the capacity of the production system using building permit data for new single family homes in Chandler, Ariz. The applicability of Little’s law, a basic equation used in factory production management models, to a residential production system is examined. This study shows a definite, predictable relationship between cycle time, work in process, and production system throughput. It provides a pathway for further study of production system characteristics that have historically not been included in construction management models, with the expectation of developing new construction management tools that will account for more of the characteristics of construction production systems that affect project performance and company financial performance.
    publisherAmerican Society of Civil Engineers
    titleProduction System Loading–Cycle Time Relationship in Residential Construction
    typeJournal Paper
    journal volume131
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:1(15)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian