YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Binary Resource Leveling Model: Activity Splitting Allowed

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 006
    Author:
    Jaeho Son
    ,
    Kris G. Mattila
    DOI: 10.1061/(ASCE)0733-9364(2004)130:6(887)
    Publisher: American Society of Civil Engineers
    Abstract: The resource leveling problem is common and has been studied numerous times. In these studies and the resulting solutions, there exists a common element, which is once an activity is started, it cannot be stopped and restarted again. That is, it cannot be split. In many instances in actual construction, there exist activities that can be stopped and restarted. However, not all activities have this characteristic. This paper presents a linear program binary variable model to level resources that permits selected activities to stop and restart. This splitting of activities results in improvement to the leveling solution that is traditionally achieved when splitting is not permitted. Examples are presented that illustrate the improvement in the solution obtained from the proposed model compared to models that do not allow splitting and compares the result to that obtained using commercially available software. The results are beneficial to construction professionals who may be unaware of the impacts of using activity splitting.
    • Download: (534.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Binary Resource Leveling Model: Activity Splitting Allowed

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/22776
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJaeho Son
    contributor authorKris G. Mattila
    date accessioned2017-05-08T20:39:49Z
    date available2017-05-08T20:39:49Z
    date copyrightDecember 2004
    date issued2004
    identifier other%28asce%290733-9364%282004%29130%3A6%28887%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/22776
    description abstractThe resource leveling problem is common and has been studied numerous times. In these studies and the resulting solutions, there exists a common element, which is once an activity is started, it cannot be stopped and restarted again. That is, it cannot be split. In many instances in actual construction, there exist activities that can be stopped and restarted. However, not all activities have this characteristic. This paper presents a linear program binary variable model to level resources that permits selected activities to stop and restart. This splitting of activities results in improvement to the leveling solution that is traditionally achieved when splitting is not permitted. Examples are presented that illustrate the improvement in the solution obtained from the proposed model compared to models that do not allow splitting and compares the result to that obtained using commercially available software. The results are beneficial to construction professionals who may be unaware of the impacts of using activity splitting.
    publisherAmerican Society of Civil Engineers
    titleBinary Resource Leveling Model: Activity Splitting Allowed
    typeJournal Paper
    journal volume130
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2004)130:6(887)
    treeJournal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian