YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Cumulative Effect of Project Changes for Electrical and Mechanical Construction

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 006
    Author:
    Awad S. Hanna
    ,
    Richard Camlic
    ,
    Pehr A. Peterson
    ,
    Min-Jae Lee
    DOI: 10.1061/(ASCE)0733-9364(2004)130:6(762)
    Publisher: American Society of Civil Engineers
    Abstract: Change is inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and money that can be spent on planning, executing, and delivering the project. Change clauses, which authorize the owner to alter work performed by the contractor, are included in most construction contracts and provide a mechanism for equitable adjustment to the contract price and duration. Even so, owners and contractors do not always agree on the adjusted contract price or the time it will take to incorporate the change. What is needed is a method to quantify the impact that the adjustments required by the change will have on the changed and unchanged work. Owners and our legal system recognize that contractors have a right to an adjustment in contract price for owner changes, including the cost associated with materials, labor, lost profit, and increased overhead due to changes. However, the actions of a contractor can impact a project just as easily as those of an owner. A more complex issue is that of determining the cumulative impact that single or multiple change orders may have over the life of a project. This paper presents a method to quantify the cumulative impact on labor productivity for mechanical and electrical construction resulting from changes in the project. Statistical hypothesis testing and correlation analysis were made to identify factors that affect productivity loss resulting from change orders. A multiple regression model was developed to estimate the cumulative impact of change orders. The model includes six significant factors, namely: Percent change, change order processing time, overmanning, percentage of time the project manager spent on the project, percentage of the changes initiated by the owner, and whether the contractor tracks productivity or not. Sensitivity analysis was performed on the model to study the impact of one factor on the productivity loss (%delta). The model can be used proactively to determine the impacts that management decisions will have on the overall project productivity. They may also be used at the conclusion of the project as a dispute resolution tool. It should be noted that every project is unique, so these tools need to be applied with caution.
    • Download: (111.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Cumulative Effect of Project Changes for Electrical and Mechanical Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/22621
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAwad S. Hanna
    contributor authorRichard Camlic
    contributor authorPehr A. Peterson
    contributor authorMin-Jae Lee
    date accessioned2017-05-08T20:39:31Z
    date available2017-05-08T20:39:31Z
    date copyrightDecember 2004
    date issued2004
    identifier other%28asce%290733-9364%282004%29130%3A6%28762%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/22621
    description abstractChange is inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and money that can be spent on planning, executing, and delivering the project. Change clauses, which authorize the owner to alter work performed by the contractor, are included in most construction contracts and provide a mechanism for equitable adjustment to the contract price and duration. Even so, owners and contractors do not always agree on the adjusted contract price or the time it will take to incorporate the change. What is needed is a method to quantify the impact that the adjustments required by the change will have on the changed and unchanged work. Owners and our legal system recognize that contractors have a right to an adjustment in contract price for owner changes, including the cost associated with materials, labor, lost profit, and increased overhead due to changes. However, the actions of a contractor can impact a project just as easily as those of an owner. A more complex issue is that of determining the cumulative impact that single or multiple change orders may have over the life of a project. This paper presents a method to quantify the cumulative impact on labor productivity for mechanical and electrical construction resulting from changes in the project. Statistical hypothesis testing and correlation analysis were made to identify factors that affect productivity loss resulting from change orders. A multiple regression model was developed to estimate the cumulative impact of change orders. The model includes six significant factors, namely: Percent change, change order processing time, overmanning, percentage of time the project manager spent on the project, percentage of the changes initiated by the owner, and whether the contractor tracks productivity or not. Sensitivity analysis was performed on the model to study the impact of one factor on the productivity loss (%delta). The model can be used proactively to determine the impacts that management decisions will have on the overall project productivity. They may also be used at the conclusion of the project as a dispute resolution tool. It should be noted that every project is unique, so these tools need to be applied with caution.
    publisherAmerican Society of Civil Engineers
    titleCumulative Effect of Project Changes for Electrical and Mechanical Construction
    typeJournal Paper
    journal volume130
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2004)130:6(762)
    treeJournal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian