YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Incident Causation Model for Improving Feedback of Safety Knowledge

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 004
    Author:
    D. K. H. Chua
    ,
    Y. M. Goh
    DOI: 10.1061/(ASCE)0733-9364(2004)130:4(542)
    Publisher: American Society of Civil Engineers
    Abstract: In order for the construction industry to improve its poor safety performance it needs to learn from its mistakes and put the lessons learned to good use. This need calls for effective feedback mechanisms that can transmit information derived from incident investigation to be utilized in safety planning. The feedback should be at two levels; first, feedback to the Safety Management System that had failed, and second, feedback to the safety planning of future projects. The first level of feedback can be achieved by basing the investigation on an incident investigation model that explicitly identifies system failure. The second level of feedback can be achieved if both incident investigation and safety planning share the same incident causation model, such that the information from each process can be retrieved and utilized in the other process smoothly. One prerequisite to fulfill the two levels of feedback is the development of an incident causation model. In this paper, the modified loss causation model (MLCM), which is able to meet the above-mentioned purposes, will be presented. The MLCM is developed based on an extensive literature review and application on 140 actual accident cases obtained from Singapore’s Ministry of Manpower, Occupational Safety Department. In this paper, the model’s application will be demonstrated through a case study, which involves codification of investigation information based on an actual incident report, and a safety planning process based on a hypothetical case.
    • Download: (1.026Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Incident Causation Model for Improving Feedback of Safety Knowledge

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/22309
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorD. K. H. Chua
    contributor authorY. M. Goh
    date accessioned2017-05-08T20:38:56Z
    date available2017-05-08T20:38:56Z
    date copyrightAugust 2004
    date issued2004
    identifier other%28asce%290733-9364%282004%29130%3A4%28542%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/22309
    description abstractIn order for the construction industry to improve its poor safety performance it needs to learn from its mistakes and put the lessons learned to good use. This need calls for effective feedback mechanisms that can transmit information derived from incident investigation to be utilized in safety planning. The feedback should be at two levels; first, feedback to the Safety Management System that had failed, and second, feedback to the safety planning of future projects. The first level of feedback can be achieved by basing the investigation on an incident investigation model that explicitly identifies system failure. The second level of feedback can be achieved if both incident investigation and safety planning share the same incident causation model, such that the information from each process can be retrieved and utilized in the other process smoothly. One prerequisite to fulfill the two levels of feedback is the development of an incident causation model. In this paper, the modified loss causation model (MLCM), which is able to meet the above-mentioned purposes, will be presented. The MLCM is developed based on an extensive literature review and application on 140 actual accident cases obtained from Singapore’s Ministry of Manpower, Occupational Safety Department. In this paper, the model’s application will be demonstrated through a case study, which involves codification of investigation information based on an actual incident report, and a safety planning process based on a hypothetical case.
    publisherAmerican Society of Civil Engineers
    titleIncident Causation Model for Improving Feedback of Safety Knowledge
    typeJournal Paper
    journal volume130
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2004)130:4(542)
    treeJournal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian