YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Decision Support Model for the Allocation of Resources in Rehabilitation Projects

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 002
    Author:
    Igal M. Shohet
    ,
    Eldad Perelstein
    DOI: 10.1061/(ASCE)0733-9364(2004)130:2(249)
    Publisher: American Society of Civil Engineers
    Abstract: Maintenance management is becoming increasingly important in the building industry. Some of the reasons for this trend are: The large variety of uses for which buildings are constructed, the increase in the number of tall buildings, the increased use of electro-mechanical systems in buildings, and the higher performance of buildings. Because the financial resources for the maintenance of buildings and infrastructures are always limited, there is a need to find ways to allocate them among the various projects suggested for rehabilitation, renovation, and upgrading of existing buildings. The model developed in the present research to solve the problem of resource allocation is implemented in two stages, namely: (1) elimination of unfeasible solutions and (2) identification of five solution configurations that are close to the optimum. The model may be implemented in either of two ways: (1) maximization of benefits while adhering to a fixed budget or (2) minimization of costs while putting the emphasis on the performance of the buildings. The first approach is suitable for organizations interested in reducing the costs of maintenance. The second approach is suitable for organizations that wish to achieve the highest performance possible. The model developed was tested in a computer decision support system. The resultant solutions were evaluated using a large number of representative cases. The development of the model was finalized after subjecting it to sensitivity analyses. In this way, the effects of variations in conditions on the overall performance and costs were examined.
    • Download: (94.89Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Decision Support Model for the Allocation of Resources in Rehabilitation Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/21876
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorIgal M. Shohet
    contributor authorEldad Perelstein
    date accessioned2017-05-08T20:38:06Z
    date available2017-05-08T20:38:06Z
    date copyrightApril 2004
    date issued2004
    identifier other%28asce%290733-9364%282004%29130%3A2%28249%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/21876
    description abstractMaintenance management is becoming increasingly important in the building industry. Some of the reasons for this trend are: The large variety of uses for which buildings are constructed, the increase in the number of tall buildings, the increased use of electro-mechanical systems in buildings, and the higher performance of buildings. Because the financial resources for the maintenance of buildings and infrastructures are always limited, there is a need to find ways to allocate them among the various projects suggested for rehabilitation, renovation, and upgrading of existing buildings. The model developed in the present research to solve the problem of resource allocation is implemented in two stages, namely: (1) elimination of unfeasible solutions and (2) identification of five solution configurations that are close to the optimum. The model may be implemented in either of two ways: (1) maximization of benefits while adhering to a fixed budget or (2) minimization of costs while putting the emphasis on the performance of the buildings. The first approach is suitable for organizations interested in reducing the costs of maintenance. The second approach is suitable for organizations that wish to achieve the highest performance possible. The model developed was tested in a computer decision support system. The resultant solutions were evaluated using a large number of representative cases. The development of the model was finalized after subjecting it to sensitivity analyses. In this way, the effects of variations in conditions on the overall performance and costs were examined.
    publisherAmerican Society of Civil Engineers
    titleDecision Support Model for the Allocation of Resources in Rehabilitation Projects
    typeJournal Paper
    journal volume130
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2004)130:2(249)
    treeJournal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian