YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Establish Concrete Placing Rates Using Quality Control Records from Hong Kong Building Construction Projects

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 002
    Author:
    Ming Lu
    ,
    Michael Anson
    DOI: 10.1061/(ASCE)0733-9364(2004)130:2(216)
    Publisher: American Society of Civil Engineers
    Abstract: This paper focuses on the topic of data collection as appropriate for the productivity study of ready mixed concrete placing methods. Classification and description of various concrete placing methods are given. The normally available quality control (QC) records for 462 concrete pours from five ongoing Hong Kong building construction projects were captured into a database, representing a total of 6,833 truckmixer trips out of two major concrete plants in Hong Kong. By querying the database, the placing rates for particular placing methods were established, and validated by comparison with existing industry benchmarks. One promising observation is that in general the Hong Kong construction sites may now be more efficient in processing truckmixers than they were a decade ago. The normal concreting QC records, routinely accumulated on site in a mandatory and standardized fashion, include the timing and quantity data as needed because of the time-sensitive nature of freshly mixed concrete. Data of this type is a better and more convenient alternative to collection by direct observation and measurement. The concreting placing rates for the various placing methods derived from the database are found to be potentially of direct value for assisting concrete plant and site managers in estimating the progress of work and attaining better coordination in concrete supply and placing between concrete suppliers and site contractors. They also serve as performance yardsticks for benchmarking the state of the Hong Kong concreting industry as time goes by and indeed, and most usefully, for comparison with other large cities if similar records are obtained for processing from those cities.
    • Download: (456.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Establish Concrete Placing Rates Using Quality Control Records from Hong Kong Building Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/21831
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMing Lu
    contributor authorMichael Anson
    date accessioned2017-05-08T20:38:01Z
    date available2017-05-08T20:38:01Z
    date copyrightApril 2004
    date issued2004
    identifier other%28asce%290733-9364%282004%29130%3A2%28216%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/21831
    description abstractThis paper focuses on the topic of data collection as appropriate for the productivity study of ready mixed concrete placing methods. Classification and description of various concrete placing methods are given. The normally available quality control (QC) records for 462 concrete pours from five ongoing Hong Kong building construction projects were captured into a database, representing a total of 6,833 truckmixer trips out of two major concrete plants in Hong Kong. By querying the database, the placing rates for particular placing methods were established, and validated by comparison with existing industry benchmarks. One promising observation is that in general the Hong Kong construction sites may now be more efficient in processing truckmixers than they were a decade ago. The normal concreting QC records, routinely accumulated on site in a mandatory and standardized fashion, include the timing and quantity data as needed because of the time-sensitive nature of freshly mixed concrete. Data of this type is a better and more convenient alternative to collection by direct observation and measurement. The concreting placing rates for the various placing methods derived from the database are found to be potentially of direct value for assisting concrete plant and site managers in estimating the progress of work and attaining better coordination in concrete supply and placing between concrete suppliers and site contractors. They also serve as performance yardsticks for benchmarking the state of the Hong Kong concreting industry as time goes by and indeed, and most usefully, for comparison with other large cities if similar records are obtained for processing from those cities.
    publisherAmerican Society of Civil Engineers
    titleEstablish Concrete Placing Rates Using Quality Control Records from Hong Kong Building Construction Projects
    typeJournal Paper
    journal volume130
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2004)130:2(216)
    treeJournal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian