YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Constraint-Based Planning with Integrated Production Scheduler over Internet

    Source: Journal of Construction Engineering and Management:;2003:;Volume ( 129 ):;issue: 003
    Author:
    D. K. H. Chua
    ,
    L. J. Shen
    ,
    S. H. Bok
    DOI: 10.1061/(ASCE)0733-9364(2003)129:3(293)
    Publisher: American Society of Civil Engineers
    Abstract: Identifying and removing constraints from bottleneck activities help to reduce uncertainties in construction processes and increases the transparency of project management. The present means of look-ahead planning do poorly in resolving hidden constraints in the supply chain and information flow. Accordingly, work plans are vulnerable to the uncertainties that result in flow variation. It has been realized that reducing and eliminating critical constraints through better means of look-ahead planning are the keys to achieving reliable workflow and, consequently, increased productivity. This paper presents a constraint-based planning tool, Integrated Production Scheduler (IPS), to enhance planning reliability while adopting lean construction principles and the theory of constraints. Unlike the critical path method, the IPS models two additional types of constraints related to resource supply and information exchange. It employs four activity buffers: working, shielding, pulling, and screening for managing critical constraints and shielding the production from uncertainties. The implementation of the IPS is prototyped as a distributed scheduling system using Internet technologies such as Java and XML. It facilitates setting up a transparent project management environment where faster communication and active collaboration among project members are achievable.
    • Download: (1.157Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Constraint-Based Planning with Integrated Production Scheduler over Internet

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/20965
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorD. K. H. Chua
    contributor authorL. J. Shen
    contributor authorS. H. Bok
    date accessioned2017-05-08T20:36:21Z
    date available2017-05-08T20:36:21Z
    date copyrightJune 2003
    date issued2003
    identifier other%28asce%290733-9364%282003%29129%3A3%28293%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/20965
    description abstractIdentifying and removing constraints from bottleneck activities help to reduce uncertainties in construction processes and increases the transparency of project management. The present means of look-ahead planning do poorly in resolving hidden constraints in the supply chain and information flow. Accordingly, work plans are vulnerable to the uncertainties that result in flow variation. It has been realized that reducing and eliminating critical constraints through better means of look-ahead planning are the keys to achieving reliable workflow and, consequently, increased productivity. This paper presents a constraint-based planning tool, Integrated Production Scheduler (IPS), to enhance planning reliability while adopting lean construction principles and the theory of constraints. Unlike the critical path method, the IPS models two additional types of constraints related to resource supply and information exchange. It employs four activity buffers: working, shielding, pulling, and screening for managing critical constraints and shielding the production from uncertainties. The implementation of the IPS is prototyped as a distributed scheduling system using Internet technologies such as Java and XML. It facilitates setting up a transparent project management environment where faster communication and active collaboration among project members are achievable.
    publisherAmerican Society of Civil Engineers
    titleConstraint-Based Planning with Integrated Production Scheduler over Internet
    typeJournal Paper
    journal volume129
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2003)129:3(293)
    treeJournal of Construction Engineering and Management:;2003:;Volume ( 129 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian