YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Constraint Programming Approach to Precast Production Scheduling

    Source: Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 006
    Author:
    W. T. Chan
    ,
    Hao Hu
    DOI: 10.1061/(ASCE)0733-9364(2002)128:6(513)
    Publisher: American Society of Civil Engineers
    Abstract: Current scheduling practices in precast plants are fairly basic and depend greatly on experience. This may lead to inefficient resource utilization, over-inventory, and/or missing delivery dates. Computer assisted scheduling may therefore be useful in producing better production schedules. This paper shows how constraint programming (CP) can be applied in production scheduling for precast plants. The paper describes a constrained precast scheduling model that incorporates the key constraints and objectives considered by production schedulers. A capacity-based backward-scheduling earliest due date rule and a CP approach are developed to solve the model. The CP approach is computationally efficient, even though it incorporates many problem-derived constraints. The efficiency of the CP approach lies in the fact that the representation (model) is separated from the algorithm (solver). Strategies to improve the performance of the CP approach are identified, and the CP approach is compared against commonly used heuristic rules on an example problem.
    • Download: (102.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Constraint Programming Approach to Precast Production Scheduling

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/20510
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorW. T. Chan
    contributor authorHao Hu
    date accessioned2017-05-08T20:35:28Z
    date available2017-05-08T20:35:28Z
    date copyrightDecember 2002
    date issued2002
    identifier other%28asce%290733-9364%282002%29128%3A6%28513%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/20510
    description abstractCurrent scheduling practices in precast plants are fairly basic and depend greatly on experience. This may lead to inefficient resource utilization, over-inventory, and/or missing delivery dates. Computer assisted scheduling may therefore be useful in producing better production schedules. This paper shows how constraint programming (CP) can be applied in production scheduling for precast plants. The paper describes a constrained precast scheduling model that incorporates the key constraints and objectives considered by production schedulers. A capacity-based backward-scheduling earliest due date rule and a CP approach are developed to solve the model. The CP approach is computationally efficient, even though it incorporates many problem-derived constraints. The efficiency of the CP approach lies in the fact that the representation (model) is separated from the algorithm (solver). Strategies to improve the performance of the CP approach are identified, and the CP approach is compared against commonly used heuristic rules on an example problem.
    publisherAmerican Society of Civil Engineers
    titleConstraint Programming Approach to Precast Production Scheduling
    typeJournal Paper
    journal volume128
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2002)128:6(513)
    treeJournal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian