YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Automated Generation of Work Spaces Required by Construction Activities

    Source: Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 004
    Author:
    Burcu Akinci
    ,
    Martin Fischer
    ,
    John Kunz
    DOI: 10.1061/(ASCE)0733-9364(2002)128:4(306)
    Publisher: American Society of Civil Engineers
    Abstract: To provide a safe and productive environment, project managers need to plan for the work spaces required by construction activities. Work space planning involves representing various types of spaces required by construction activities in three dimensions and across time. Since a construction schedule consists of hundreds of activities requiring multiple types of spaces, it is practically impossible to expect project managers to specify manually the spatiotemporal data necessary to represent work spaces in four dimensions. This paper presents mechanisms that automatically generate project-specific work spaces from a generic work space ontology and a project-specific IFC (industry foundation class) based 4D production model. The generation of these work spaces leads to a space-loaded production model. Within this model, work spaces are represented as being related to the relevant construction activities and methods and as having attributes that describe when, where, and how long they exist, and how much volume they occupy. These space-loaded production models enable richer 4D CAD simulations, time-space conflict analysis, and proactive work space planning prior to construction.
    • Download: (1.196Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Automated Generation of Work Spaces Required by Construction Activities

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/20210
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorBurcu Akinci
    contributor authorMartin Fischer
    contributor authorJohn Kunz
    date accessioned2017-05-08T20:34:52Z
    date available2017-05-08T20:34:52Z
    date copyrightAugust 2002
    date issued2002
    identifier other%28asce%290733-9364%282002%29128%3A4%28306%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/20210
    description abstractTo provide a safe and productive environment, project managers need to plan for the work spaces required by construction activities. Work space planning involves representing various types of spaces required by construction activities in three dimensions and across time. Since a construction schedule consists of hundreds of activities requiring multiple types of spaces, it is practically impossible to expect project managers to specify manually the spatiotemporal data necessary to represent work spaces in four dimensions. This paper presents mechanisms that automatically generate project-specific work spaces from a generic work space ontology and a project-specific IFC (industry foundation class) based 4D production model. The generation of these work spaces leads to a space-loaded production model. Within this model, work spaces are represented as being related to the relevant construction activities and methods and as having attributes that describe when, where, and how long they exist, and how much volume they occupy. These space-loaded production models enable richer 4D CAD simulations, time-space conflict analysis, and proactive work space planning prior to construction.
    publisherAmerican Society of Civil Engineers
    titleAutomated Generation of Work Spaces Required by Construction Activities
    typeJournal Paper
    journal volume128
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2002)128:4(306)
    treeJournal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian