YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Quantitative Definition of Projects Impacted by Change Orders

    Source: Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 001
    Author:
    Awad S. Hanna
    ,
    Richard Camlic
    ,
    Pehr A. Peterson
    ,
    Erik V. Nordheim
    DOI: 10.1061/(ASCE)0733-9364(2002)128:1(57)
    Publisher: American Society of Civil Engineers
    Abstract: Change, defined as any event that results in a modification of the original scope, execution time, or cost of work, is inevitable on most construction projects due to the uniqueness of each project and the limited resources of time and money available for planning. Change may occur on a project for a number of reasons, such as design errors, design changes, additions to the scope, or unknown conditions. For each change, contractors are entitled to an equitable adjustment to the base contract price and schedule for all productivity impacts associated with the change. Changes may or may not have an impact on labor productivity. Existing literature uses subjective evaluation to determine whether the project is impacted. Projects impacted by change cause the contractor to achieve a lower productivity level than planned. The focus of this paper is to quantify whether an electrical or mechanical project is impacted by a change order. Through statistical hypothesis testing, groups of factors that correlate with whether a project is impacted by change orders were identified and used to develop a quantitative definition of impact. Logistic regression techniques were used to develop models that predict the probability of a project being impacted. The results of this research show that percent change, type of trade, estimated and actual peak manpower, processing time of change, overtime, overmanning, and percent change related to design issues are the main factors contributing to the project impact.
    • Download: (216.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Quantitative Definition of Projects Impacted by Change Orders

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/19809
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAwad S. Hanna
    contributor authorRichard Camlic
    contributor authorPehr A. Peterson
    contributor authorErik V. Nordheim
    date accessioned2017-05-08T20:34:05Z
    date available2017-05-08T20:34:05Z
    date copyrightFebruary 2002
    date issued2002
    identifier other%28asce%290733-9364%282002%29128%3A1%2857%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/19809
    description abstractChange, defined as any event that results in a modification of the original scope, execution time, or cost of work, is inevitable on most construction projects due to the uniqueness of each project and the limited resources of time and money available for planning. Change may occur on a project for a number of reasons, such as design errors, design changes, additions to the scope, or unknown conditions. For each change, contractors are entitled to an equitable adjustment to the base contract price and schedule for all productivity impacts associated with the change. Changes may or may not have an impact on labor productivity. Existing literature uses subjective evaluation to determine whether the project is impacted. Projects impacted by change cause the contractor to achieve a lower productivity level than planned. The focus of this paper is to quantify whether an electrical or mechanical project is impacted by a change order. Through statistical hypothesis testing, groups of factors that correlate with whether a project is impacted by change orders were identified and used to develop a quantitative definition of impact. Logistic regression techniques were used to develop models that predict the probability of a project being impacted. The results of this research show that percent change, type of trade, estimated and actual peak manpower, processing time of change, overtime, overmanning, and percent change related to design issues are the main factors contributing to the project impact.
    publisherAmerican Society of Civil Engineers
    titleQuantitative Definition of Projects Impacted by Change Orders
    typeJournal Paper
    journal volume128
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2002)128:1(57)
    treeJournal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian