YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Developing a Draft Schedule Using Templates and Rules

    Source: Journal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 005
    Author:
    Nicola J. Chevallier
    ,
    Alan D. Russell
    DOI: 10.1061/(ASCE)0733-9364(2001)127:5(391)
    Publisher: American Society of Civil Engineers
    Abstract: The effort required for the initial drafting of a plan is often a real barrier to developing a useful and high quality schedule for a construction project. The goal of this paper is to demonstrate how an expert system with an editable rule base can be combined with standard templates of modifiable, predefined knowledge within a project management system in order to generate draft schedules based on limited user input. The user can capitalize on past experience by creating a template for each recurring project type. The knowledge contained in the templates is broken down into a physical view (i.e., what is being built), a process view (i.e., how it will be built), and rules for scaling the templates and computing durations based on user input. The physical view is a hierarchical breakdown structure of components that describes (without quantifying) the physical and spatial characteristics of the project type. The process view contains a list of typical activities and the logic relationships that describe their sequencing. The rules serve to link and then expand the two views in order to generate a draft schedule for the project-at-hand once its scale is specified. The feasibility and capabilities of the proposed approach are demonstrated in the context of a full-sized project composed of three buildings.
    • Download: (952.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Developing a Draft Schedule Using Templates and Rules

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/19532
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorNicola J. Chevallier
    contributor authorAlan D. Russell
    date accessioned2017-05-08T20:33:33Z
    date available2017-05-08T20:33:33Z
    date copyrightOctober 2001
    date issued2001
    identifier other%28asce%290733-9364%282001%29127%3A5%28391%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/19532
    description abstractThe effort required for the initial drafting of a plan is often a real barrier to developing a useful and high quality schedule for a construction project. The goal of this paper is to demonstrate how an expert system with an editable rule base can be combined with standard templates of modifiable, predefined knowledge within a project management system in order to generate draft schedules based on limited user input. The user can capitalize on past experience by creating a template for each recurring project type. The knowledge contained in the templates is broken down into a physical view (i.e., what is being built), a process view (i.e., how it will be built), and rules for scaling the templates and computing durations based on user input. The physical view is a hierarchical breakdown structure of components that describes (without quantifying) the physical and spatial characteristics of the project type. The process view contains a list of typical activities and the logic relationships that describe their sequencing. The rules serve to link and then expand the two views in order to generate a draft schedule for the project-at-hand once its scale is specified. The feasibility and capabilities of the proposed approach are demonstrated in the context of a full-sized project composed of three buildings.
    publisherAmerican Society of Civil Engineers
    titleDeveloping a Draft Schedule Using Templates and Rules
    typeJournal Paper
    journal volume127
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2001)127:5(391)
    treeJournal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian