| contributor author | C. M. Tam | |
| contributor author | Thomas K. L. Tong | |
| contributor author | Wilson K. W. Chan | |
| date accessioned | 2017-05-08T20:33:14Z | |
| date available | 2017-05-08T20:33:14Z | |
| date copyright | August 2001 | |
| date issued | 2001 | |
| identifier other | %28asce%290733-9364%282001%29127%3A4%28315%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/19376 | |
| description abstract | Site layout planning is a complicated issue because of the vast number of trades and interrelated planning constraints. To unfold its complexity, this paper aims to confine the study to a particularly defined area of construction: the structural concrete-frame construction stage of public housing projects. In this study, optimization of the tower crane and supply locations is targeted, as they are the major site facilities for high-rise building construction. A site layout genetic algorithm model is developed and a practical example is presented. The optimization results of the example are very promising and demonstrate the application value of the model. | |
| publisher | American Society of Civil Engineers | |
| title | Genetic Algorithm for Optimizing Supply Locations around Tower Crane | |
| type | Journal Paper | |
| journal volume | 127 | |
| journal issue | 4 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)0733-9364(2001)127:4(315) | |
| tree | Journal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 004 | |
| contenttype | Fulltext | |