Applying Modified Minimum Moment Method to Multiple Resource LevelingSource: Journal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 003Author:Mohammed A. Salem Hiyassat
DOI: 10.1061/(ASCE)0733-9364(2001)127:3(192)Publisher: American Society of Civil Engineers
Abstract: The purpose of this paper is to extend the modification of the minimum moment approach applied to networks with single resource leveling to networks with multiple resources. Specifically, the contribution of this paper is to outline a procedure to level multiple resources using the modified minimum moment approach. The heuristic procedure is applied to both methods of leveling multiple resources: leveling multiple resources in series and combined resource leveling. For comparison purposes, the proposed procedure is demonstrated through the same examples that were used to illustrate the use of the traditional minimum moment to both methods of multiple resource leveling. The application of the modified minimum moment approach showed the same results of the traditional minimum moment method. In some cases, the obtained results were even better than those of the traditional method.
|
Show full item record
| contributor author | Mohammed A. Salem Hiyassat | |
| date accessioned | 2017-05-08T20:32:51Z | |
| date available | 2017-05-08T20:32:51Z | |
| date copyright | June 2001 | |
| date issued | 2001 | |
| identifier other | %28asce%290733-9364%282001%29127%3A3%28192%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/19210 | |
| description abstract | The purpose of this paper is to extend the modification of the minimum moment approach applied to networks with single resource leveling to networks with multiple resources. Specifically, the contribution of this paper is to outline a procedure to level multiple resources using the modified minimum moment approach. The heuristic procedure is applied to both methods of leveling multiple resources: leveling multiple resources in series and combined resource leveling. For comparison purposes, the proposed procedure is demonstrated through the same examples that were used to illustrate the use of the traditional minimum moment to both methods of multiple resource leveling. The application of the modified minimum moment approach showed the same results of the traditional minimum moment method. In some cases, the obtained results were even better than those of the traditional method. | |
| publisher | American Society of Civil Engineers | |
| title | Applying Modified Minimum Moment Method to Multiple Resource Leveling | |
| type | Journal Paper | |
| journal volume | 127 | |
| journal issue | 3 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)0733-9364(2001)127:3(192) | |
| tree | Journal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 003 | |
| contenttype | Fulltext |