Show simple item record

contributor authorYuan-Shyi Peter Chiu
contributor authorSinga Wang Chiu
date accessioned2017-05-09T00:20:46Z
date available2017-05-09T00:20:46Z
date copyrightFebruary, 2006
date issued2006
identifier issn1087-1357
identifier otherJMSEFK-27914#375_1.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/134193
description abstractConventional approaches for deriving optimal production lot size are by using the differential calculus on the production-inventory cost function with the need to prove optimality first. Recent articles proposed the algebraic approach to the solution of classic economic order quantity and economic production quantity (EPQ) model without reference to the use of derivatives. This note extends it to an EPQ model taking the random defective rate and imperfect rework process into consideration. We demonstrate that the optimal lot size can be solved algebraically and the expected inventory cost can be derived immediately as well.
publisherThe American Society of Mechanical Engineers (ASME)
titleNote on “Effects of Random Defective Rate and Imperfect Rework Process on Economic Production Quantity Model”
typeJournal Paper
journal volume128
journal issue1
journal titleJournal of Manufacturing Science and Engineering
identifier doi10.1115/1.2039948
journal fristpage375
journal lastpage377
identifier eissn1528-8935
keywordsManufacturing
keywordsMathematical analysis AND Cycles
treeJournal of Manufacturing Science and Engineering:;2006:;volume( 128 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record