| contributor author | Yuan-Shyi Peter Chiu | |
| contributor author | Singa Wang Chiu | |
| date accessioned | 2017-05-09T00:20:46Z | |
| date available | 2017-05-09T00:20:46Z | |
| date copyright | February, 2006 | |
| date issued | 2006 | |
| identifier issn | 1087-1357 | |
| identifier other | JMSEFK-27914#375_1.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/134193 | |
| description abstract | Conventional approaches for deriving optimal production lot size are by using the differential calculus on the production-inventory cost function with the need to prove optimality first. Recent articles proposed the algebraic approach to the solution of classic economic order quantity and economic production quantity (EPQ) model without reference to the use of derivatives. This note extends it to an EPQ model taking the random defective rate and imperfect rework process into consideration. We demonstrate that the optimal lot size can be solved algebraically and the expected inventory cost can be derived immediately as well. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Note on “Effects of Random Defective Rate and Imperfect Rework Process on Economic Production Quantity Model” | |
| type | Journal Paper | |
| journal volume | 128 | |
| journal issue | 1 | |
| journal title | Journal of Manufacturing Science and Engineering | |
| identifier doi | 10.1115/1.2039948 | |
| journal fristpage | 375 | |
| journal lastpage | 377 | |
| identifier eissn | 1528-8935 | |
| keywords | Manufacturing | |
| keywords | Mathematical analysis AND Cycles | |
| tree | Journal of Manufacturing Science and Engineering:;2006:;volume( 128 ):;issue: 001 | |
| contenttype | Fulltext | |