description abstractFlow diagrams for exergy have been made for Unit 2 at the Umm Al Nar West power plant in Abu Dhabi. This unit is one of six in a combined power and desalination facility, each delivering 60 MW of electricity and 18000 metric tons per day of freshwater at design conditions. The diagrams show the rates of exergy flow between all of the components in the facility as well as the consumption in each. For the desalination facility, diagrams were developed for both summer and winter operation, at design conditions. The steam generation and power plant diagrams were made for full and three-quarter electrical loads, and full-load delivery of steam to the desalination plant. Furthermore, detailed exergy costing diagrams have been constructed for the steam/power facility, at both full and three-quarter electrical load conditions. Conclusions are drawn regarding means for improving the existing plant and future designs.
publisherThe American Society of Mechanical Engineers (ASME)
titleSecond Law Efficiency and Costing Analysis of a Combined Power and Desalination Plant
typeJournal Paper
journal volume110
journal issue2
journal titleJournal of Energy Resources Technology
identifier doi10.1115/1.3231364
journal fristpage114
journal lastpage118
identifier eissn1528-8994
keywordsIndustrial plants
keywordsSteam
keywordsStress
keywordsExergy
keywordsDesign
keywordsPower stations AND Flow (Dynamics)
treeJournal of Energy Resources Technology:;1988:;volume( 110 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record