YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Scheduling Policies for the Stochastic Resource Leveling Problem 

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 002
    Author(s): Hongbo Li; Zhe Xu; Erik Demeulemeester
    Publisher: American Society of Civil Engineers
    Abstract: When uncertainties come into play, the leveled baseline schedule obtained by solving the deterministic resource leveling problem can hardly be executed as planned and this schedule may even become infeasible. In addition, ...
    Request PDF

    Longitudinal Seismic Response of a Shield Tunnel Considering Longitudinal Bolt Prestress under Transverse Excitation 

    Source: International Journal of Geomechanics:;2024:;Volume ( 024 ):;issue: 003:;page 04024011-1
    Author(s): Xiangyu Guo; Ping Geng; Zhe Xu; Rui Tang; Chuan He; Qipeng Cai
    Publisher: ASCE
    Abstract: A shield tunnel is an assembled structure that is composed of segments and connecting bolts, and its longitudinal seismic response needs to be investigated. Bolt prestress is a common measure for shield tunnels, and ...
    Request PDF

    Multistakeholder Conflict Minimization–Based Layout Planning of Construction Temporary Facilities 

    Source: Journal of Computing in Civil Engineering:;2018:;Volume ( 032 ):;issue: 002
    Author(s): Song Xiaoling;Zhong Lin;Zhang Zhe;Xu Jiuping;Shen Charles;Peña-Mora Feniosky
    Publisher: American Society of Civil Engineers
    Abstract: The layout planning of construction temporary facilities (CTFs) is a specific construction site layout problem. Despite considerable research undertaken to determine satisfactory layouts of CTFs for their significance on ...
    Request PDF

    Leakage Detection in Water Distribution Systems Based on Logarithmic Spectrogram CNN for Continuous Monitoring 

    Source: Journal of Water Resources Planning and Management:;2024:;Volume ( 150 ):;issue: 006:;page 04024015-1
    Author(s): Hao Peng; Zhe Xu; Qinglong Huang; Liqiang Qi; Haitao Wang
    Publisher: ASCE
    Abstract: In the context of the Internet of Things, there is a growing demand for real-time monitoring of water distribution systems (WDS). Among the various leak detection methods, acoustic leak detection is considered to be a ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian