Search
Now showing items 1-5 of 5
Dynamic Response and Failure Analysis of Underground Openings to Oblique Wave Incidence
Publisher: ASCE
Abstract: In deep underground mine, besides the high static in situ stress, openings such as stopes, drifts, and shafts in underground mine are also frequently subjected to dynamic waves coming from blasting and earthquake. The ...
Lessons Learned on Adopting Automated Compliance Checking in the AEC Industry: A Global Study
Publisher: American Society of Civil Engineers
Abstract: Over the last decades, numerous automated compliance checking (ACC) systems have been developed. However, ACC is still not broadly used in the architecture, engineering, and construction (AEC) industry today; little is ...
Integrating the Last Planner System and Immersive Virtual Reality: Exploring the Social Mechanisms Produced by Using LPS in Projects
Publisher: American Society of Civil Engineers
Abstract: Over the last 30 years, the last planner system (LPS), as a Lean-driven production planning and control tool, has consistently demonstrated its capability to improve planning reliability and overall performance in ...
Understanding Social Interaction and Physiological Patterns in Nonlean and Last Planner System–Based Project Teams: A Comparative Study Using Immersive Virtual Reality
Publisher: American Society of Civil Engineers
Abstract: There are different interactions and physiological patterns in coordination meetings between non-lean and last planner system (LPS)-based project teams. This phenomenon is the result of the top-down workflow control in the ...
Investigating the New Zealand Off-Site Manufacturing Industry’s Readiness for Automated Compliance Checking
Publisher: ASCE
Abstract: Numerous automated compliance checking (ACC) approaches have been developed over the last half of the twentieth century. However, little is known as to how well the ACC technology has served the off-site manufacturing (OSM) ...