YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Neurofuzzy Decision Support System for Efficient Risk Allocation in Public-Private Partnership Infrastructure Projects 

    Source: Journal of Computing in Civil Engineering:;2010:;Volume ( 024 ):;issue: 006
    Author(s): Xiao-Hua Jin
    Publisher: American Society of Civil Engineers
    Abstract: The performance of public-private partnership (PPP) infrastructure projects is largely contingent on whether the adopted risk allocation (RA) strategy is efficient. Theoretical frameworks drawing on the transaction cost ...
    Request PDF

    Determinants of Efficient Risk Allocation in Privately Financed Public Infrastructure Projects in Australia 

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 002
    Author(s): Xiao-Hua Jin
    Publisher: American Society of Civil Engineers
    Abstract: Risk allocation in privately financed public infrastructure projects, which are mainly referred to as public-private partnership (PPP) projects, is a challenging job due to the nature of incomplete contracting. An investigation ...
    Request PDF

    Model for Efficient Risk Allocation in Privately Financed Public Infrastructure Projects Using Neuro-Fuzzy Techniques 

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 011
    Author(s): Xiao-Hua Jin
    Publisher: American Society of Civil Engineers
    Abstract: Risk allocation plays a critical role in privately financed public infrastructure projects. Project performance is contingent on whether the adopted risk-allocation strategy can lead to efficient risk management. Founded ...
    Request PDF

    Model for Fostering Trust and Building Relationships in China’s Construction Industry 

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 011
    Author(s): Xiao-Hua Jin; Florence Yean Yng Ling
    Publisher: American Society of Civil Engineers
    Abstract: Trust is an underlying psychological condition that can cause cooperation or risk-taking. Trust is considered as a predominant feature and a central mechanism in business transactions, especially among Chinese. Trust-based ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian