Search
Now showing items 1-4 of 4
Modeling the Degradation Rate of the Wood Frame Doors and Windows of the National Palace of Sintra, Portugal
Publisher: American Society of Civil Engineers
Optimizing Service Life Prediction Models of External Paint Finishes
Publisher: ASCE
Abstract: In the present research effort, the topic of service life prediction is revisited, using external paint finishes on rendered facades as a case study. A statistically robust approach to develop ordinary linear regression ...
Role of Statistics and Engineering Judgment in Developing Optimized Time-Cost Relationship Models
Publisher: American Society of Civil Engineers
Abstract: When estimating the duration of the construction stage during the design stages of construction projects, empirical models are often used as a substitute for more accurate estimates based on detailed scheduling. These ...
Risk-Informed Time-Cost Relationship Models for Sanitation Projects
Publisher: American Society of Civil Engineers
Abstract: The purpose of this study is to (1) verify whether the time performance of water and sewer projects is statistically different; and (2) develop time-cost relationship (TCR) models for sanitation projects in Chicago, Illinois. ...