Arch First and Beam Later: Arch-Rib Integral Installation Construction Technology for Large-Span Tied-Arch Bridge
Publisher: American Society of Civil Engineers
Abstract: Tied-arch bridges are usually constructed using the beam first and arch later method, which enjoys the advantages of a short construction period and ease with which quality control can be achieved. However, when tied-arch ...
Construction Techniques Used to Automatically Pass Standard Box Girders through Special Passenger-Line Tunnels
Publisher: American Society of Civil Engineers
Identification of Critical Causes of Tower-Crane Accidents through System Thinking and Case Analysis
Publisher: ASCE
Abstract: Tower-crane accidents occur frequently and often have serious consequences. To identify the critical causes of tower-crane accidents, this study adopted a method that combined system thinking and case analysis. The entirety ...