YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Effect of Anti-Price Gouging Law on Postdisaster Recovery Speed: Evidence from Reconstruction in Virginia and Maryland after Hurricane Sandy 

    Source: Natural Hazards Review:;2023:;Volume ( 024 ):;issue: 004:;page 04023045-1
    Author(s): Sooin Kim; Mohsen Shahandashti; Mahmut Yasar
    Publisher: ASCE
    Abstract: In the wake of a disaster, the price of essential goods and services, including reconstruction materials and labor, sharply increases. Price gouging refers to sellers and supply companies charging exorbitant prices for ...
    Request PDF

    Empirical Investigation of the Effect of Anti-Price-Gouging Law on Postdisaster Reconstruction Wages 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2024:;Volume ( 016 ):;issue: 004:;page 04524024-1
    Author(s): Sooin Kim; Mohsen Shahandashti; Mahmut Yasar
    Publisher: American Society of Civil Engineers
    Abstract: Anti-price-gouging laws are enforced by a disaster declaration to control reconstruction labor and material costs in the wake of disasters. Reconstruction costs provide an important signal in the postdisaster reconstruction ...
    Request PDF

    Pipeline Construction Cost Forecasting Using Multivariate Time Series Methods 

    Source: Journal of Pipeline Systems Engineering and Practice:;2021:;Volume ( 012 ):;issue: 003:;page 04021026-1
    Author(s): Sooin Kim; Bahram Abediniangerabi; Mohsen Shahandashti
    Publisher: ASCE
    Abstract: Pipe material and labor costs constitute about 70% of pipeline construction costs. Pipe and labor costs are subject to considerable fluctuations over time. These fluctuations are problematic for cost estimation and bid ...
    Request PDF

    Improving Accuracy in Predicting City-Level Construction Cost Indices by Combining Linear ARIMA and Nonlinear ANNs 

    Source: Journal of Management in Engineering:;2021:;Volume ( 038 ):;issue: 002:;page 04021093
    Author(s): Sooin Kim; Chi-Young Choi; Mohsen Shahandashti; Kyeong Rok Ryu
    Publisher: ASCE
    Abstract: Accurate cost forecasting in budget planning and contract bidding is crucial for the success of construction projects. Linear models such as the autoregressive integrated moving average (ARIMA) and nonlinear models such ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian