YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Prioritizing Construction Activities: Addressing the Flaws of Schedule-Based Indexes 

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 008:;page 04022069
    Author(s): Seyed Ashkan Zarghami
    Publisher: ASCE
    Abstract: Research on prioritizing construction activities that are critical to the timely completion of projects rests on a range of indexes that attempt to identify the critical path and capture uncertainty in the duration of ...
    Request PDF

    No Scheduling Problem but Rather a Rescheduling Problem: Measuring Robustness of Schedule Network in Construction Projects 

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 002:;page 04023157-1
    Author(s): Seyed Ashkan Zarghami
    Publisher: ASCE
    Abstract: The available slack-based methods for measuring the robustness of schedule networks do not pay sufficient attention to the structural characteristics of such networks nor do they provide a comparison point for measuring ...
    Request PDF

    Forecasting Project Duration in the Face of Disruptive Events: A Resource-Based Approach 

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 005:;page 04022016
    Author(s): Seyed Ashkan Zarghami
    Publisher: ASCE
    Abstract: Disruptive events are the main source of delays in projects. A key task for construction managers is to revise the project schedule plan based on time delays caused by these events. Consequently, project management research ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian