YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Mixed Reality-Based Approach for Minimizing Time Uncertainty in Prefabrication 

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 011:;page 04024147-1
    Author(s): Helamini Sandagomika; Ankit Shringi; Saeed Reza Mohandes; Ahmed Farouk Kineber; Milad Bazli; Mehrdad Arashpour
    Publisher: American Society of Civil Engineers
    Abstract: Prefabrication is highly recognized in construction due to its inherent cost efficiency, quality control, and sustainability benefits. However, the presence of uncertainties in prefabrication processes hinders the realization ...
    Request PDF

    A Coupled Genetic Programming Monte Carlo Simulation–Based Model for Cost Overrun Prediction of Thermal Power Plant Projects 

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 008:;page 04022073
    Author(s): Muhammad Saiful Islam; Saeed Reza Mohandes; Amir Mahdiyar; Alireza Fallahpour; Ayokunle Olubunmi Olanipekun
    Publisher: ASCE
    Abstract: Globally, power projects are prone to cost overrun projects. Within the body of knowledge, previous studies have paid less attention to predicting the cost overruns to assist contingency cost planning. Particularly, in ...
    Request PDF

    Examining the Barriers to the Adoption of IoT-Based Technologies in Green Buildings 

    Source: Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 003:;page 04024211-1
    Author(s): Ali Rahimian; Rana Rabnawaz Ahmed; Abdulwahed Fazeli; Ehsan Aghdam; Atul Kumar Singh; Mahdi Naji; Saeed Reza Mohandes; Maxwell Fordjour Antwi-Afari; Tarek Zayed
    Publisher: American Society of Civil Engineers
    Abstract: Although the adoption of Internet of Things (IoTs) for green buildings (GBs) has attracted significant attention from researchers and practitioners in the construction sector, few studies have investigated the barriers to ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian