YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Effect of Change Orders on Cost and Schedule for Small Low-Bid Highway Contracts 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 004
    Author(s): Pramen P. Shrestha; Ruiko Maharjan
    Publisher: American Society of Civil Engineers
    Abstract: For design-bid-build (DBB) projects, the assumption is that because the bid cost of the lowest bidder is usually below the estimated cost of the project, change orders during construction will increase. This study collected ...
    Request PDF

    Performance of Design-Build and Construction Manager-at-Risk Methods in Water and Wastewater Projects 

    Source: Practice Periodical on Structural Design and Construction:;2019:;Volume ( 024 ):;issue: 001
    Author(s): Pramen P. Shrestha; Ruiko Maharjan; Jacimaria R. Batista
    Publisher: American Society of Civil Engineers
    Abstract: A capital investment of about USD 1.3 trillion is needed over the next 25 years to repair or replace the drinking water main breaks that occur each year in the United States. The use of two alternative delivery ...
    Request PDF

    Cost, Change Order, and Schedule Performance of Highway Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 001:;page 04521044
    Author(s): Bandana Shrestha; Pramen P. Shrestha; Ruiko Maharjan; Douglas Gransberg
    Publisher: ASCE
    Abstract: Costs, change orders, and schedule performances of highway projects built using the design-bid-build (DBB) method by state departments of transportation have been tracked for more than five decades. As technology improves, ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian