YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Planning-Phase Estimation of Construction Time for a Large Portfolio of Highway Projects 

    Source: Journal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 004
    Author(s): Junghye Son; Nabeel Khwaja; Duane S. Milligan
    Publisher: American Society of Civil Engineers
    Abstract: Estimation of highway project construction time prior to design development has received comparatively little focus from researchers. State transportation agencies (STAs) and their management teams need a method or tool ...
    Request PDF

    Lessons Learned from Selection of Project Delivery Methods in Highway Projects: The Texas Experience 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    Author(s): Vassiliki Demetracopoulou; William J. O’Brien; Nabeel Khwaja
    Publisher: ASCE
    Abstract: The effectiveness of a project delivery method selection depends on distinct characteristics, desired goals, institutional constraints, and the correct allocation of risk. The selection of the appropriate method is a complex ...
    Request PDF

    Impact of Multiple Highway Funding Categories and Project Eligibility Restrictions on Pavement Performance 

    Source: Journal of Infrastructure Systems:;2019:;Volume ( 025 ):;issue: 001
    Author(s): Jojo France-Mensah; William J. O’Brien; Nabeel Khwaja
    Publisher: American Society of Civil Engineers
    Abstract: In maintenance and rehabilitation (M&R) programming, most budget allocation models in literature often assume one principal budget that can be used for funding all the different projects undertaken by the decision-making ...
    Request PDF

    Quantitative Approach to Assess Social Equity in Road Networks 

    Source: Journal of Infrastructure Systems:;2023:;Volume ( 029 ):;issue: 004:;page 04023029-1
    Author(s): Chirag Kothari; William J. O’Brien; Junfeng Jiao; Nabeel Khwaja
    Publisher: ASCE
    Abstract: Highway agencies are increasingly directed to broadly incorporate social equity goals into infrastructure planning. To better accommodate these goals in their decision making, it is essential for practitioners to assess ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian