YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-5 of 5

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Delay Claims in Road Construction: Best Practices for a Standard Delay Claims Management System 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2016:;Volume ( 008 ):;issue: 003
    Author(s): Mohammed S. Hashem M. Mehany; Neil Grigg
    Publisher: American Society of Civil Engineers
    Request PDF

    Causes of Road and Bridge Construction Claims: Analysis of Colorado Department of Transportation Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2015:;Volume ( 007 ):;issue: 002
    Author(s): Mohammed S. Hashem M. Mehany; Neil Grigg
    Publisher: American Society of Civil Engineers
    Abstract: Road and highway construction projects are plagued by unanticipated conditions and changes, which cause claims and cost overruns due to diverse causes. This study identified a set of project factors that might affect the ...
    Request PDF

    Risk-Managed Lifecycle Costing for Asphalt Road Construction and Maintenance Projects under Performance-Based Contracts 

    Source: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2016:;Volume ( 002 ):;issue: 004
    Author(s): Mohammed S. Hashem M. Mehany; Angela Acree Guggemos
    Publisher: American Society of Civil Engineers
    Request PDF

    Best-Value Procurement in Transportation: Lessons Learned from Bid Protest Challenges 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 003:;page 04525034-1
    Author(s): Chaimae Nacir; Ghada M. Gad; Christofer Harper; Mohammed S. Hashem M. Mehany
    Publisher: American Society of Civil Engineers
    Abstract: The best value (BV) procurement method, which incorporates nonprice factors in addition to price, has gained traction in the transportation sector, particularly for complex projects. However, effectively and objectively ...
    Request PDF

    A Comprehensive Categorization and Flowcharting for Schedule Delay Analysis Methods 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 001:;page 04524028-1
    Author(s): Mary Valerie Angela Trinidad Garcia; Mohammed S. Hashem M. Mehany; Ahmed Abdelaty; Gunnar Lucko
    Publisher: American Society of Civil Engineers
    Abstract: A bewildering array of over two dozen delay analysis methods exists from which construction professionals may choose. However, no comprehensive comparison and synthesis have been made for all such methods as to their ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian