YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 11

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Augmented Balance Point Diagrams for Matching Site and Concrete-Supply Resources 

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 004
    Author(s): Michael Anson; Ming-Fung Francis Siu
    Publisher: ASCE
    Abstract: Matching site concrete-placing resources with the appropriate number of concrete-delivery truckmixers depends upon good site and concrete plant coordination if good concreting productivity is to be achieved. In general ...
    Request PDF

    Factors Influencing Adoption of Construction Robotics in Hong Kong’s Industry: A Multistakeholder Perspective 

    Source: Journal of Management in Engineering:;2021:;Volume ( 038 ):;issue: 002:;page 04021096
    Author(s): Kwok Kwan Law; Siwei Chang; Ming-Fung Francis Siu
    Publisher: ASCE
    Abstract: Previous studies have explored the factors to the usage of construction robotics (CRs). However, what is the most important factor affecting adoption of CRs considering multistakeholders? Do different stakeholders share ...
    Request PDF

    Modified Stepwise Regression Approach to Streamlining Predictive Analytics for Construction Engineering Applications 

    Source: Journal of Computing in Civil Engineering:;2017:;Volume ( 031 ):;issue: 003
    Author(s): Arash Mohsenijam; Ming-Fung Francis Siu; Ming Lu
    Publisher: American Society of Civil Engineers
    Request PDF

    Zero-One Programming Approach to Determine Optimum Resource Supply under Time-Dependent Resource Constraints 

    Source: Journal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 002
    Author(s): Ming-Fung Francis Siu; Ming Lu; Simaan AbouRizk
    Publisher: American Society of Civil Engineers
    Abstract: Skilled labor is critical to any construction project. The determination of optimum resource supply quantities over different project time periods compounds the resource-constrained project scheduling problem, which has ...
    Request PDF

    Resource Supply-Demand Matching Scheduling Approach for Construction Workface Planning 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 001
    Author(s): Ming-Fung Francis Siu; Ming Lu; Simaan AbouRizk
    Publisher: American Society of Civil Engineers
    Abstract: This paper discusses a novel approach for resource-based scheduling that builds upon existing analytical models to achieve practical allocation of resources that are constrained by supply and demand. The approach facilitates ...
    Request PDF

    Zero-One Programming Approach to Determine Optimum Resource Supply under Time-Dependent Resource Constraints 

    Source: Journal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 002
    Author(s): Ming-Fung Francis Siu; Ming Lu; Simaan AbouRizk
    Publisher: American Society of Civil Engineers
    Abstract: Skilled labor is critical to any construction project. The determination of optimum resource supply quantities over different project time periods compounds the resource-constrained project scheduling problem, which has ...
    Request PDF

    Resource Supply-Demand Matching Scheduling Approach for Construction Workface Planning 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 001
    Author(s): Ming-Fung Francis Siu; Ming Lu; Simaan AbouRizk
    Publisher: American Society of Civil Engineers
    Abstract: This paper discusses a novel approach for resource-based scheduling that builds upon existing analytical models to achieve practical allocation of resources that are constrained by supply and demand. The approach facilitates ...
    Request PDF

    Equipment Logistics Performance Measurement Using Data-Driven Social Network Analysis 

    Source: Journal of Construction Engineering and Management:;2019:;Volume (0145):;issue:005
    Author(s): Chang Liu;Wenying Ji;Simaan M. AbouRizk;Ming-Fung Francis Siu
    Publisher: American Society of Civil Engineers
    Abstract: The construction industry relies heavily on the use of equipment. Equipment management for a single project is, in itself, challenging, and large contractors who want to achieve long-term success must also manage equipment ...
    Request PDF

    Quantitative Assessment of Budget Sufficiency and Resource Utilization for Resource-Constrained Project Schedules 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 006
    Author(s): Ming-Fung Francis Siu; Ming Lu; Simaan AbouRizk; Vincent Tidder
    Publisher: American Society of Civil Engineers
    Abstract: Assessment of budget sufficiency and resource utilization for a resource-constrained project schedule is crucial to ensure practical feasibility of the schedule and successful delivery of a construction project. This paper ...
    Request PDF

    Operation Effort Optimization for Planning Performance-Based Snow-Removal Projects 

    Source: Journal of Computing in Civil Engineering:;2017:;Volume ( 031 ):;issue: 006
    Author(s): Ming-Fung Francis Siu; Chang Liu; Rod Wales; Simaan AbouRizk
    Publisher: American Society of Civil Engineers
    Abstract: Bid proposals for performance-based snow-removal projects are evaluated based on estimated operation efforts and service areas of proposed shop locations and quantities. Dispatch shop location and quantity must be sufficient ...
    Request PDF
    • 1
    • 2
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian