Search
Now showing items 1-4 of 4
Generating a Daily Bill of Materials at Level of Development 400 Using the Smallest Workface Boundary
Publisher: ASCE
Abstract: Observations and sample tests at five construction sites showed that the time required for generating a daily bill of materials (BOM) is within the range of 12–68 min. However, 20 foremen interviewed at the sites ...
Empirical Determination of the Smallest Batch Sizes for Daily Planning
Publisher: ASCE
Abstract: Level of development (LOD) 400 is the level of building information modeling (BIM) defined for fabrication and, hence, the level appropriate for defining the daily scope of construction work. However, when a supervisor ...
Field Study on the Connection between BIM and Daily Work Orders
Publisher: American Society of Civil Engineers
VDC Scorecard: Formulation, Application, and Validation
Publisher: American Society of Civil Engineers
CSV
RIS