Search
Now showing items 1-2 of 2
Daily Generation Scheduling of Cascade Hydro Plants Considering Peak Shaving Constraints
Publisher: American Society of Civil Engineers
Abstract: This paper considers the operation of hydro plants, tackles the problem of daily hydro-generation scheduling (DHGS), and obtains the optimal hourly operation of cascade hydropower reservoirs. To meet the practical operational ...
A Probabilistic Runoff Prediction Model Based on Improved Long Short-Term Memory and Interval Correction
Publisher: American Society of Civil Engineers
Abstract: Accurate and reliable runoff prediction is essential for the efficient operation of hydropower systems. This paper presented a runoff probability prediction model that utilizes an enhanced long short-term memory (LSTM) ...