YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Shuffled Frog-Leaping Model for Solving Time-Cost-Resource Optimization Problems in Construction Project Planning 

    Source: Journal of Computing in Civil Engineering:;2015:;Volume ( 029 ):;issue: 001
    Author(s): Baabak Ashuri; Mehdi Tavakolan
    Publisher: American Society of Civil Engineers
    Abstract: Time-cost-resources usage variation trade-off analysis is one of the most challenging tasks of construction project planners. Project planners face complicated multivariate, time-cost-resource optimization (TCRO) problems, ...
    Request PDF

    Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets 

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 011
    Author(s): Banafsheh Zahraie; Mehdi Tavakolan
    Publisher: American Society of Civil Engineers
    Abstract: In a construction project, the cost and duration of activities could change due to different uncertain variables such as weather, resource availability, etc. Resource leveling and allocation strategies also influence total ...
    Request PDF

    Fuzzy Enabled Hybrid Genetic Algorithm–Particle Swarm Optimization Approach to Solve TCRO Problems in Construction Project Planning 

    Source: Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 009
    Author(s): Baabak Ashuri; Mehdi Tavakolan
    Publisher: American Society of Civil Engineers
    Abstract: One of the most challenging tasks of a construction project planner is to simultaneously minimize the total project cost and total project duration while considering issues related to optimal resource allocation and resource ...
    Request PDF

    Fuzzy Weighted Interpretive Structural Modeling: Improved Method for Identification of Risk Interactions in Construction Projects 

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 011
    Author(s): Mehdi Tavakolan; Hannaneh Etemadinia
    Publisher: American Society of Civil Engineers
    Abstract: The construction industry has a major role in the economic development of any country. Because of the nature of the construction industry and its unique characteristics, and the overtime work and overbudget funds spent on ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian