Work Continuity Constraints in Project Scheduling
Publisher: American Society of Civil Engineers
Abstract: Repetitive projects involve the repetition of activities along the stages of the project. Since the resources required to perform these activities move from one stage to the other, a main objective of scheduling these ...
Empirical Perspective on Activity Durations for Project-Management Simulation Studies
Publisher: American Society of Civil Engineers
Abstract: Simulation has played an important role in project-management studies of the last decades, but in order for them to produce practical results, a realistic distribution model for activity durations is indispensable. The ...
Integrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing
Publisher: ASCE
Abstract: Earned value management (EVM) and earned duration management (EDM) are established methodologies to monitor the project performance during execution. These methods serve as a basis to forecast the final project duration ...
Study of the Stability of Earned Value Management Forecasting
Publisher: American Society of Civil Engineers
Abstract: In this paper, the authors focus on the stability of earned value management (EVM) forecasting methods. The contribution is threefold. First of all, a new criterion to measure stability that does not suffer from the ...
Empirical Perspective on Activity Durations for Project-Management Simulation Studies
Publisher: American Society of Civil Engineers
Abstract: Simulation has played an important role in project-management studies of the last decades, but in order for them to produce practical results, a realistic distribution model for activity durations is indispensable. The ...
Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost
Publisher: American Society of Civil Engineers
Abstract: The ability to accurately forecast a project’s final duration and cost is essential to successful project management. The technique of earned value management (EVM) is considered to provide an effective methodology for ...