YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Cost Contingency and Cost Evolvement of Construction Projects in the Preconstruction Phase 

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 006
    Author(s): Erfan Hoseini; Marian Bosch-Rekveldt; Marcel Hertogh
    Publisher: ASCE
    Abstract: The current literature discusses the methods to estimate the costs and cost contingency. The literature also distinguishes “known unknowns” and “unknown unknowns” contingencies. Little is written, however, about the ...
    Request PDF

    Incorporating Project Complexities in Risk Assessment: Case of an Airport Expansion Construction Project 

    Source: Journal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 006:;page 05022015
    Author(s): Lise Andringa; Önder Ökmen; Martijn Leijten; Marian Bosch-Rekveldt; Hans Bakker
    Publisher: ASCE
    Abstract: In today’s construction projects, which are getting more complex as a consequence of especially technical, organizational, and external aspects, complexities are considered a major source of risks. Moreover, risks may turn ...
    Request PDF

    Breakdown of Engineering Projects’ Success Criteria 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 011:;page 04021144-1
    Author(s): Mladen Radujković; Mariela Sjekavica Klepo; Marian Bosch-Rekveldt
    Publisher: ASCE
    Abstract: This paper presents the findings from a study of the breakdown of project success criteria. An exploration of the evolution of studies on the success of engineering projects over decades was the basis for a project success ...
    Request PDF

    Cost Performance and Cost Contingency during Project Execution: Comparing Client and Contractor Perspectives 

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 004
    Author(s): Erfan Hoseini; Pim van Veen; Marian Bosch-Rekveldt; Marcel Hertogh
    Publisher: ASCE
    Abstract: Current literature shows that poor cost performance in projects has become routine. Research on cost performance has mostly focused on one of the involved parties, either the client or the contractor. Not many research ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian