YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Tracking Delay Analysis 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 003:;page 04521020-1
    Author(s): Mariam Elazhary
    Publisher: ASCE
    Abstract: Delays are a matter of fact in the majority of construction projects; accordingly, the field of forensic planning resulted in numerous delay methods being utilized. Implementing these methods has given rise to the major ...
    Request PDF

    Framework for the Application of Blockchain Technology to Delay Analysis 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 002:;page 04522063-1
    Author(s): Mariam Elazhary; Ossama Hosny
    Publisher: American Society of Civil Engineers
    Abstract: Delay analysis and all its relevant techniques is an eminently sought-after area of study; in fact, delay analysis within the construction industry is currently a field that lies under the umbrella of ongoing progressiveness. ...
    Request PDF

    Automated Management of Time Extension Claims 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2024:;Volume ( 016 ):;issue: 002:;page 04523059-1
    Author(s): Mariam Elazhary; Ossama Hosny
    Publisher: ASCE
    Abstract: Disputes within the construction industry have caused parties to incur additional costs not accounted for. Ranking as one of the highest sources of disputes, there is a need to diminish reliance on the human factor in the ...
    Request PDF

    Quantitative Assessment of the Architect’s Role under US Standard Construction Contracts: A Graph Theory Approach 

    Source: Journal of Management in Engineering:;2024:;Volume ( 040 ):;issue: 005:;page 04024031-1
    Author(s): Mariam Elazhary; Ahmed Shiha; Islam H. El-adaway; Sammi Young
    Publisher: American Society of Civil Engineers
    Abstract: Evaluating the architect’s role in construction contracts is vital for improving the contractual relationship and preventing disputes. Standard contracts define the architect as an owner’s agent and/or a contract administrator. ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian